8 of this instruction and follow its guidelines. In case of any doubts regarding warranty points, please reach out immediately to the company Reventon Group Sp. z o. o. [Ltd.] before taking any action. This documentation was developed by the company Reventon Group Sp.
The heat recovery unit must be attached to a vertical partition with 4.1 CONNECTION TO VENTILATION SYSTEM the appropriate load capacity (see the net weight of the unit in the The ventilation system must be carried out in accordance with the section 2.3) with the mounting panel (included in the set).
Periodical inspection and maintenance of the device according Boost speed - pressing the button causes that the device starts to work to the guidelines below, should be carried out with the given at the boost speed (described as V stage in the table in point 2.3), frequencies and always after two-weeks or a longer period of inactivity.
Changing the arrangement of the inlets and the outlets - press and hold CONTROLLING OF A DUCT HEATER VIA THE CONTROL PANEL VERTIC the '+' button for 6 seconds to switch to the editing mode of this Between the terminals of the electrical duct heater (see point 7) parameter.
4 – Stamp and signature of installer: Heating/cooling installation (if applicable) Ventilation installation (if applicable) Electrical installation (if applicable) * serial number is required only for water heaters HC-3S, HC-EC and FARMER HCF series and recovery units INSPIRO, INSPIRO BASIC and VERTIC series...
Page 8
Reventon Group Sp. z o.o. [Ltd.], 556 Wyzwolenia Street, 43-340 Kozy, Poland, www.reventongroup.eu v1.2024...
This manual is also suitable for:
Vertic enthalpy seriesVertic 250Vertic 250 enthalpyVertic-250-2047Vertic-250e-2321Vertic 350...
Show all
Need help?
Do you have a question about the VERTIC Series and is the answer not in the manual?
Questions and answers