ASUS will only be responsible for or indemnify you for loss, damages or claims based in contract, tort or infringement under this Warranty Statement. This limit also applies to ASUS’ suppliers and its reseller. It is the maximum for which ASUS, its suppliers, and your reseller are collectively responsible.
1. Safety Precautions FOR PRODUCTS CONTAINING LASER: DANGER- Invisible laser radiation when open. AVOID DIRECT EXPOSURE TO BEAM. CAUTION- Use of controls or adjustments or performance of procedures other than those specified herein may result in hazardous radiation exposure. CAUTION- The use of optical instruments with this product will increase eye hazard. TO ENSURE THE CONTINUED RELIABILITY OF THIS PRODUCT, USE ONLY ORIGINAL MANUFACTURER'S REPLACEMENT PARTS, WHICH ARE LISTED WITH THEIR PART NUMBERS IN THE PARTS LIST SECTION OF THIS SERVICE MANUAL...
3. Disassembly and Assembly Procedures Disassembly SOP Preparation before disassemble 1. Clean the room for disassemble 2. Identify the area for monitor 3. Check the position that the monitors be placed and the quantity of the monitor; prepare the area for material flow; according to the actual condition plan the disassemble layout 4.
Page 7
3. Unlock 4 screws on Torque : Back Cover. 8~10kg- Screw: (#SCRW FPHM4*10L(7.7/1.6)B- ZNNY) 4. Disassemble Back Cover from panel (From Top side). 5. Remove Mylar*2. 1. Remove the FFC wire. Screw driver...
Page 8
2. Remove the 3 cables from Main Board. 3. Remove the LVDS Cable from Panel (Read) and cables from LED Driver Board (Green & Blue). 4. Remove shielding Panel. 5. Remove the cables from Power Board & Main Board. 6. Remove the mylar from Power Board &...
Page 9
8. Disassemble 7 screws on Board then remove Board Power Board from shielding and pull out the wires from Board. Screw: Torque: (#SCRW PH INT/TOO 6.5±0.5K M3*9TP-S C-ZN) g-cm Power Main Board Board 9. Unlock 2 screws on Shielding to remove Fan.
Page 10
1. Disassemble 1 screws & cables on MCU Board then remove MCU Board. Board Screw: Torque : (#SCRW TAP-P PH 8~10kg- W/FL M3*6L B-ZN Y) 2. Unlock 10 screws on middle frame then disassemble middle frame and Panel. Torque: Screw:(#SCRW MACH 4.0±0.5K FLATM3*0.5P*4.5L ZN) g-cm...
Page 11
6. Unlock 4 screws to remove LED Driver Board. Screw:(#SCRW TP-S Torque: LED Driver PH W/FL M3*6L ZN) 6~8 kg- Board 7. Unlock 2 screws on Torque: Panel remove Fan. 3.0±0.5K Screw:M2*8L(4.5/.8) g-cm NINYL)
Page 12
1. Disassemble Mylar from Shielding. 2. Remove tape on the Panel then remove Thermal Sensor Board. 3. Remove rubbers & unlock 5 screws to remove Key Board & Light sensor Board from middle frame. Screw:(#SCRW TP-B Torque: FPH M2*2.4L ZN ) 2.0±0.5K g-cm 4.
Page 13
1. Disassemble motor module from middle frame. 2. Remove motor from Color Sensor Cover. 3. Remove Color Sensor Board from Color Sensor Cover. 4. Disassemble Speaker from shielding.
3.2 Assembly SOP Preparation before assemble 1. Clean the room for work 2. Identify the area for material 3. Prepare the implement, equipment and materials as bellow: 1) Working table 2) Screw-driver 3) Glove 4) Cleaning cloth 5) ESD protection After unplugging the power cord, the power Board still have power energe.
Page 15
4. Insert motor to Sensor Board Cover. Assemble fan on the Shielding and lock 2 screws. Torque: Screw: (SCRW M FPH 3.0±0.5Kg- M2*8L(4.5/.8) NINYL) Assemble Speaker to shielding. Insert the wire to Screw Main Board & Driver Power Board. Main Board Power Main...
Page 16
Assemble 7 screws fix Board on the Power Main shielding. Board Torque: Board Screw: 6.5±0.5Kg- (#SCRW PH INT/TOO M3*9TP-S C-ZN) Assemble 2 screws on shielding. Torque: Screw: 3.0±0.5Kg- (SCRW M FPH M2*8.6L(S3.6) BNI) Insert FFC wire to Key Board then lock 4 screws...
Page 17
1. Insert the wires to Thermal Sensor Board. 2. Assemble Thermal Sensor Board on the Panel mark line. 3. Paste the tape fix the Thermal Sensor Board. Screw drive 4. Paste mylar on the panel.
Page 18
5. Insert the wires then lock 4 screws to fix LED Driver Board on shielding. Torque : LED Driver Screw: 6~8 kg-cm Board (#SCRW TP-S PH W/FL M3*6L ZN) 6. Insert wires to connector of panel top side and LED Driver Board.
Page 19
8. Lock 2 screws on Panel remove Fan. Torque: Screw: 3.0±0.5Kg- (SCRW M FPH M2*8L(4.5/.8) NINYL) 9. Insert wires to connector of panel down side and LED Driver Board. 10. Assemble middle frame on the Panel then lock 10 screws. Screw: Torque: (#SCRW MACH...
Page 20
1. Assemble Transfer Board on MF then lock 1 screw. Screw: Torque: (#SCRW TP-B FPH 1.4±0.5Kg- M2*4L B-ZN) 2. Put motor module on the middle frame then lock 2 screws and insert FFC wire to Transfer Board. Screw: Torque: (SCRW TAP FPH 1.4±0.5Kg- M1.4*3L NI) 3.
Page 21
5. Insert LVDS cable to Panel and the cables of LED Driver Board need through the hole of shielding. 6. Insert wires to connector of Power Board and Main Board. 7. Insert the Speaker wire on the “SPK” connector. 8. Insert the fan wire in the shielding on the “T FAN”...
Page 22
11. Paste adhesive to fix wires near connectors of Main Board 12. Paste the Mylar on the shielding.
Page 23
1. Assemble Back Cover then lock 4 screws on Rear Case. Torque : Screw: 8~10kg- (#SCRW FPHM4*10L(7.7/1.6)B- ZNNY) 2. Lock 2 screws on Back Cover. Torque: Screw: 3.0±0.5Kg- (#SCRW FPHM4*10L(7.7/1.6)B- ZNNY)
Page 24
1. Have the front of the monitor face down on a table. 2. Attach the arm into the monitor. Attach the base into the arm, making sure the tab on the Stand fits into the groove on the base (Figure 1). 3.
Need help?
Do you have a question about the PA24US and is the answer not in the manual?
Questions and answers