IFYIL Rumelia User Manual

Hydro / air pellet stove / cooker

Advertisement

Quick Links

Rumelia - Bosphorus Plus / Standard
BOSPHORUS HYDRO PELLET STOVE / COOKER
RUMELIA AIR PELLET STOVE / COOKER (CANALIZABLE)
USERGUIDE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Rumelia and is the answer not in the manual?

Questions and answers

Summary of Contents for IFYIL Rumelia

  • Page 1 Rumelia - Bosphorus Plus / Standard BOSPHORUS HYDRO PELLET STOVE / COOKER RUMELIA AIR PELLET STOVE / COOKER (CANALIZABLE) USERGUIDE...
  • Page 2 İFYIL TERMO İKLİMLENDİRME SAN. ve TİC. LTD. ŞTİ. CONTACT INFO Web site: www.ifyil.com.tr Phone: +90 (850) 346 0 362 Fax: +90 (362) 266 94 43 E-mail: info@ifyil.com.tr Adress: Kavak Organize Sanayi Bölgesi 3. Cad. No.11 Kavak/Samsun/TÜRKİYE...
  • Page 3: Table Of Contents

    3- TECHNICAL SPECIFICATIONS 4- MAIN PARTS AND DIMENSIONS 4-1 Bosphorus Standard Dimensions 4-2 Bosphorus Standard Parts 4-3 Bosphorus Plus Dimensions 4-4 Bosphorus Plus Parts 4-5 Rumelia Dimensions 4-6 Rumelia Parts 5- INSTALLATION 5-1 Operating Environment 5-2 Electrical Connections 5-3 Plumbing Connections...
  • Page 4 6- MAINBOARD CONNECTION SCHEMAS 7- CONTROL PANEL 7-1 Information Menu 7-2 User Menu-1 7-3 Chorono Setting menu 7-4 User Menu - 2 7-5 Errors Codes 8- OPERATING 9- FUEL CALIBRATION 10- OVEN USE 11- PUMP WARNING LAMP 12- MAINTENANCE and CLEANING 13- PROBLEMS, CAUSES and SOLUTIONS 14- SIGNIFICIANT INSTRUCTIONS for EFFECTIVE USING...
  • Page 5: Introduction

    Please read this user guide carefully before starting to use our stove and keep it as a reference in any case. This user guide; • Rumelia • Bosphorus Plus • Bosphorus Standard Products includes. Information This symbol high lightens the significant details for correct usage of stove.
  • Page 6: 1- Important Notice

    • The product should be installed in accordance with the legislation of the country in which it will be used and the necessary safety precautions should be taken. Otherwise IFYIL will not accept any responsibility. • This is a cooker / pellets stove. Please only use wood pellets as fuel.
  • Page 7: Operating Warnings

    1-2 Operating Warnings • Assembly of İFYIL pellet stoves and fireplaces; Electrical connections and installation should be done in accordance with the scheme. • Pellets stoves are for houses, office and internal places. • Pellets stoves must not be used in: Balcony, warehouse, bathroom etc.
  • Page 8 • Automatic air prufier must be in the system. • The weight placed on the cooking surface should not exceed 35 Customers not obeying the above requirements and schemas cannot claim any right for any problem. In any case, contact your dealer or IFYIL.
  • Page 9: Fuel Information

    2- FUEL INFORMATION Wood pellets are manufactured by hot-extruding compressed sawdust which is produced during the working of natural dried wood. The compactness of the material comes from the lignin which is contained in the wood itself, and allows the production of pellets without the use of glues or binders.
  • Page 10 Tel. +90 850 346 0 362 Manufacturer: iFYlL TERMO iKLiMLENDiRME SAN. Tic. LTD. STi. www.ifyil.com.tr Kavak OSB 3. cad. No: 11 Kavak/Samsun/TURKEY info@ifyil.com.tr ( * ) PM = par�culate ma�er, OGCs = organic gaseous compounds, CO = carbon monoxide, NOX = nitrogen oxides ( **) Only required if correc�on factors F(2) or F(3) are applied.
  • Page 11 Tel. +90 850 346 0 362 Manufacturer: iFYlL TERMO iKLiMLENDiRME SAN. Tic. LTD. STi. www.ifyil.com.tr Kavak OSB 3. cad. No: 11 Kavak/Samsun/TURKEY info@ifyil.com.tr ( * ) PM = par�culate ma�er, OGCs = organic gaseous compounds, CO = carbon monoxide, NOX = nitrogen oxides ( **) Only required if correc�on factors F(2) or F(3) are applied.
  • Page 12 Measured Values Bosphorus TECHNICAL DATA Rumelia Standard Plus Fuel consumption (Min.-Maks.) kg/h 1,47-4,9 0,9-2 Maximum Operating Temperature Minimum Maximum operating pressure Test pressure Boiler Water Volme 12 + 2 12 + 2 Chimney pull required 26-43 Fuel Tank Capacity kg-lt...
  • Page 13: 4- Main Parts And Dimensions

    4- MAIN PARTS AND DIMENSIONS 4-1 Bosphorus Standard Dimensions...
  • Page 14: Bosphorus Standard Parts

    4-2 Bosphorus Standard Parts Definition External Tray Fuel tank cover Control Board Motherboard intervention cover Closed expansion intervention cover Combustion chamber cover Oven Cover Service intervention cover Combustion air intake (ø63,5mm) Chimney entrance (ø100mm) Recirculation pump Manometer On/Off Cooking Surface Hot water outlet (1”) Cold water return (1”) Heat exchanger connections...
  • Page 15: Bosphorus Plus Dimensions

    4-3 Bosphorus Plus Dimensions...
  • Page 16: Bosphorus Plus Parts

    4-4 Bosphorus Plus Parts Definition External Tray Fuel tank cover Control Board Motherboard intervention cover Closed expansion intervention cover Combustion chamber cover Oven Cover Service intervention cover Combustion air intake (ø63,5mm) Chimney entrance (ø100mm) Recirculation pump Manometer On/Off Cooking surface (glass) Hot water outlet (1”) Cold water return (1”) Heat exchanger connections...
  • Page 17: Rumelia Dimensions

    4-5 Rumelia Dimensions...
  • Page 18: Rumelia Parts

    4-6 Rumelia Parts Definition Motherboard intervention cover Combustion chamber cover Oven Cover Ash cleaning intervention cover Service intervention cover Fuel tank cover Cooking Surface Chimney entrance (Ø80mm) Hot air blower fan Combustion air intake (ø42,4 mm) Chimney entrance (Ø80mm) (optional)
  • Page 19: 5- Installation

    Rear wall A: ≥ 300 mm B: ≥ 500 mm Bosphorus Rumelia C: ≥ 1100 mm (radiation arena) D: ≥ 1000 mm E: ≥ 600 mm Figure 5.1 Safe Minimum Distance If the stove is installed next to flammable wall, isolation for the wall should be done.
  • Page 20: Electrical Connections

    • If the base where the stove is to be installed is made of flammable materials. If the stove is put on flammable material, suitable isolation must be done. • Please keep away heat sensitive materials from stove (flammable, explosive etc.). 5-2 Electrical Connections First insert the power cable into the back of the stove, then insert the cable outlet.
  • Page 21 Plumbing Connections * Example schema - 1 F İ * Example schema - 2 F İ...
  • Page 22 * Example schema - 3 F İ * Example schema - 4 F İ...
  • Page 24: Ventilation And Air Flow

    5-4 Ventilation And Air Flow • In the room where the stove is installed, there should be enough air to allow regular combustion. • The location of stove fresh air inlet must be provided. • It is recommended that the stove should be connected to an environment (external environment) where the air suction pipe can be continuously flowing clean air with hermetic pipe.
  • Page 25: Smoke Pipe Instructions

    • Chimney cap should be used to prevent the flow into the chimney flue repercussions of windy weather and rain. • Concrete blocks are affected by temperature changes, concrete flat roof which is in direct contact with the air must be absolutely isolated. •...
  • Page 26: Suitable Shapes Of Chimney

    5-7 Suitable Shapes of Chimney The remaining section of the chimney outside the home, it must be insulated. The smoke in the event of an electrical failure of your stove with a natural drive capable throw out the chimney must be applied. insulation insulation Figure 5.2 Suitable chimney shapes...
  • Page 27 Figure 5.4 Suitable chimney shapes HOUSES AND OFFICES NOT OBEYİNG THE ABOVE MENTIONED STANDARDS ARE POTENTIAL FOR FIRE AT ANYTIME AND CARBON MONOXIDE (CO) GAS LEAKAGE. PLEASE FOLLOW THE ABOVE MENTIONED INSTRUCTİONS! BY SO, CLIENT ACCEPTS IN ADVANCE THAT IN SUCH CASES MANUFACTURER DOESN’T HAVE ANY RESPONSIBILTIES CLIENT NOT FULFILLING ABOVE MENTIONED REQUIREMENTS IN SCHEMAS CANNOT CLAIM ANY RIGHT OR COMPENSATION.
  • Page 28: 6- Mainboard Connection Schemas

    6- MAINBOARD CONNECTION SCHEMAS...
  • Page 30: 7- Control Panel

    The space temperature sensor located on inputs 24-25 on the motherboard (IN 3) can be removed and the room thermostat can be connected instead. In this case, the value "P75" specified in the User menu must be 4 Combustion Reservoir Cleaning Engine located at inputs 5-6 located on the motherboard are available in Bosphorus Plus Models.
  • Page 31: Information Menu

    Function Exit the menu / Previous menu To switch the stove on or off (hold it for 3 seconds), to reset the fault (hold it down for 3 seconds) Pressing 1 times opens the User menu 1 screen, when pressed for 3 seconds, User menu 2 is opened, used to confirm the entered values.
  • Page 32: Chorono Setting Menu

    7-2 User Menu - 1 Combustion This menu allows you to modify the combustion power of the system. It can be set in modality automatic or manual: in the first case, the system will choose the combustion power; in the second case, the user selects the power.
  • Page 33 Mode Disable It allows you to select the mode of your choice or to disable Daily all the set programmes. Weekly • enter modify mode with the key P3 Weekend • select the mode of your choice (Daily, Weekly or Weekend) •...
  • Page 34 Time and Date It allows you to set day, month, year and current time Language It allows you to modify the language of the keyboard Radio control OFF : no radio control ON : the radio control is used.. Cleaning Reset Menu to reset the function ‘Cleaning’.
  • Page 35: Errors Codes

    7-5 Error Codes System Description Code Phase Boiler water temperature too high error Blok Er01 (This alarm is activated when the system is Prosestat error Blok Er02 Extinguishing at low flue temperature Blok Er03 High water temperature extinguishing Blok Er04 High water temperature Blok Er05...
  • Page 36: 8- Operating

    8- OPERATING First Fire • The pellets feeder, not provide the required number of pellets in the tank is not full every first firing. So the pellets tank, make sure that the pellets fall into the pellets feeder. • If not successful after several test burn, make sure of the correct positioning of the combustion pot.
  • Page 37: 9- Fuel Calibration

    9- FUEL CALIBRATION Calibration should be carried out during commissioning of the products and in case of replacement of the pellet used. The first calibration process (installation) must be performed by the service. Calibration procedure should be done when the boiler is cold and not working. Before starting the calibration process, place a bowl where you can weigh the pellet at the drop point of the pellet.
  • Page 38: 10- Oven Use

    Bosphorus Plus Bosphorus Standart Rumelia Gr/10dk Gr/10dk Gr/10dk 1000 1000 1100 1100 1200 1200 1300 1300 1400 1400 1500 1500 1600 1600 1700 1700 1800 1800 10- OVEN USE When the stove is running, the oven will continue to warm up to a certain point.
  • Page 39: 11- Pump Warning Lamp

    11- PUMP WARNING LAMP If the product is equipped with a Wilo pump with frequency converter; DETAILED LED COLOUR MEAN DESCRIPTION The pump is operating Normal Operation normally. Solid Green Light Pump will try to take the air in the system for 10 minutes.
  • Page 40: 12- Maintenance And Cleaning

    12- MAINTENANCE and CLEANING 12-1 Bosphorus maintenance instruction All cleaning of your stove, while your stove is not lit (when cold case) and make the electrical connection closed position. When cleaning your stove; Do not use Flammable, explosive, flammable etc chemicals that may pose a hazard. Clean the glass of your stove with a damp, soft cloth and a surface cleaner.
  • Page 41 Combustion Pot Cleaning Open the combustion chamber cover (1) when cleaning the combustion chamber. • • Move the grill table (2) / (2A) back and forth. • Visually inspect the combustion crucible for slag build-up. Remove any slag. When cleaning the crucible, make sure it is completely cold. Ashtray Cleaning •...
  • Page 42 12-2 Rumelia maintenance instruction All cleaning of your stove, while your stove is not lit (when cold case) and make the electrical connection closed position. When cleaning your stove; Do not use Flammable, explosive, flammable etc chemicals that may pose a hazard.
  • Page 43 Combustion Pot Cleaning • Open the combustion chamber cover (1) when cleaning the combustion chamber. • Visually inspect the combustion crucible for slag build-up. Remove any slag. When cleaning the crucible, make sure it is completely cold. Ashtray Cleaning • Before opening the ashtray cover, be sure to turn off the device with the On/Off button number (5), then remove the ashtray number (2).
  • Page 44 • After 2000 hours of operation, please call the technical service for stove maintenance. • Do not spray cleaner on painted parts or on fire gate seals. The display shows the message “Clean” per 200 hours and the system gives out an acoustic signal periodically. To stop signalling access to the Menu “Cleaning Reset”.
  • Page 45: 13- Problems, Causes And Solutions

    13- PROBLEMS, CAUSES and SOLUTIONS PROBLEMS CAUSES SOLUTIONS Check that the electrical socket and main switch Electrical failure or lack off are in the working position. Stove does not Fuse blown. Check the fuse work. Smoke exit or air passage Clean smoke outlet and/or through the air ducts clean the smoke duct...
  • Page 46 • Check that the room is permanently edible with clean air. • Clean the combustion bowl and check that the air vents are open. • Clean the combustion Insufficient combustion air The pellets are chamber and clean the stacked in the smoke duct.
  • Page 47 Fill the fuel tank. Fuel may be exhausted Make sure the door is Door open closed After waiting for your stove to shut down, clean Ignition failed. the burner and re-ignition. Wait for the stove to pass The stove may not have entered the powers Re-ignite if the stove is The stove is switched off.
  • Page 48: 14- Significiant Instructions For Effective Using

    Service Calls For technical service calls, please visit www.ifyil.com.tr Any right cannot be claimed due to the changes or modifications or wrong use of spare parts. IFYIL original spare parts must be used for any permitted change of spare part.
  • Page 49: Certificate Of Warranty

    Kavak OSB Kavak/ Production Date: SAMSUN/TÜRKİYE Warranty Time: Two Years +90 (362) 266 94 43 Max Reperation Time: Twenty Working Days Phone: +90 (362) 266 94 43 Fax: info@ifyil.com.tr E-Mail: Authorized Signature&Stamp IMPORTER / DEALER CUSTOMER Name: Name Surname: Address:...
  • Page 50: Warranty Conditions

    WARRANTY CONDITIONS The warranty period starts from the delivery date of the product and is two (2) years. The product is fully in warranty, except for the glass and cast parts. In case the product is found to be defective, Article 11 of the Law No. 6502 on Consumer Protection;...
  • Page 51 Product will out of Warranty when installation/any change made by non authorised personnel or services. Warranty does not covers any damages due to set up ifyil pellet stoves in open air areas, wet places, humid places or any place which directly related to all these places.
  • Page 55 “Time to heat up most efficiently” WE LOVE WORLD FOUR PELLET POWERFUL SYSTEM ADVANTAGES STYLISH DESING CENTRAL HEATING MODERN HEATING HOT WATER SOLUTIONS.. STOVE&FIREPLACE www. .com.tr...

This manual is also suitable for:

Bosphorus plusBosphorus standard

Table of Contents