Download Print this page

KHJ Kingfish Series Operation & Maintenance Manual

Advertisement

Quick Links

Contact
SHENZHEN KHJ SEMICONDUCTOR LIGHTING CO., LTD.
-----------------------------------------------------------------------------------------------------------------------------------------------------------
Address: 4-5 Floor, Building 1,Chuangxin industrial park,Xintian community,Guanlan,Longhua new district, Shenzhen ,China.
Tel: +86-755-82949977
E-mail: khjledsales@khj.cn
Web: www.khjled.com
Fax: +86-755-82949800
Web: www.khjled.com
S H E N Z H E N K H J S E M I CO N D U C TO R L I G H T I N G C O.,L T D
Opera on & Maintenance Manual
Kingfish Series-NV1.0
Important informa on:
These instruc ons contain safety informa on, read and follow them carefully. KHJ will not accept any responsibility
for injury, damage or loss which may occur due to incorrect installa on, opera on or maintenance

Advertisement

loading
Need help?

Need help?

Do you have a question about the Kingfish Series and is the answer not in the manual?

Questions and answers

Summary of Contents for KHJ Kingfish Series

  • Page 1 Important informa on: ----------------------------------------------------------------------------------------------------------------------------------------------------------- These instruc ons contain safety informa on, read and follow them carefully. KHJ will not accept any responsibility Address: 4-5 Floor, Building 1,Chuangxin industrial park,Xintian community,Guanlan,Longhua new district, Shenzhen ,China. for injury, damage or loss which may occur due to incorrect installa on, opera on or maintenance...
  • Page 2 Product Important Informa on 03. General ·These instruc ons should be read fully and carefully before a emp ng to install the luminaire. Area Classifica on Type Of Protec on Ex eb mb, Ex tb For details of servicing opera ons, opening etc. see sec on 6. (IEC)EN 60079-0, (IEC)EN 60079-7, (IEC)EN 60079-18, (IEC)EN 60079-31 ·...
  • Page 3 04. Safety instruc on (unit:mm) ·Read this leaflet carefully before commencing to install the luminaire unit and retain it for future use. Installa on can only be carried out by suitably qualified personnel. · Check the cer fica on to ensure that the Zone, mains supply, ambient temperature present and "T" ra ng are suitable for the environment the unit is being installed in.
  • Page 4 5.2 Electrical Principles and Connec ons 5.1 Installa on decomposi on It is the responsibility of the installer to ensure that the apparatus selected is fit for it is intended purpose and that the installa on, In addi on to referring to the relevant contents of this manual, the cer fied personnel who have obtained the corresponding cer ficate according to (IEC)EN60079-14 shall strictly comply with the requirements of (IEC)EN60079-14 when installing opera on and maintenance of the apparatus complies with applicable regula ons, standards or codes of prac ce.
  • Page 5: Repairs Maintenance

    11. Warning 5.3 Cascade MCB Type Rating ·WARNING – DO NOT OPEN WHEN ENERGISED · WARNING – AFTER DE-ENERGISING, DELAY 10 MINUTES BEFORE OPENING · CAUTION – USE FASTENERS WITH YIELD STRESS ≥ 450MPa According to MCB data sheet, the qty of luminaires in one Parallel connection is calculated at 230VAC ·...