Advertisement

Quick Links

Installation and Operating Guide
Document No. 1788-57
BioSafe® Hybrid Cleanroom Installation
© Copyright 2024 Terra Universal Inc. All rights reserved. • Revised Jul. 2024
Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BioSafe Hybrid Cleanroom and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Terra Universal BioSafe Hybrid Cleanroom

  • Page 1 Document No. 1788-57 BioSafe® Hybrid Cleanroom Installation © Copyright 2024 Terra Universal Inc. All rights reserved. • Revised Jul. 2024 Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 2: Table Of Contents

    Wall Panel Installation ............................ 17 Concealed Suspended Ceiling Installation ..............................18 Coving Installation ............................20 Specifications ..............................21 Warranty ................................. 21 Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 3: Introduction

    The information presented here is subject to change without notice. 1.0 Introduction This manual provides information on installing your Terra Universal BioSafe® Hybrid Cleanroom. Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 4: Base & Window Installation

    Corners should be mitered and fixed  Channel should be laid up to location of door structural opening Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 5  Place the top section of the recess base onto the bottom channel section Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 6 Once located, the panels can be sealed to the base section if required by the specification. Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 7 Slot the first wall panel into place and ensure it is plumb and level with the pre-formed corner once slotted into place Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 8 Panel 3 Panel 1 Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 9: Flush Window Installation

     Ensure adjacent panel is plumb and level Add the panel with the window already built in Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 10 Fit one of the aluminum tongue sections into the top of the base channel, sealing as required (as per wall panels)  Fit the window panel onto the vertical and horizontal tongues Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 11 Fit window header panel (which may be 3 or 4-sided depending on specification) on top of window panel and ensure all panels are plumb and level Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 12 © Copyright 2017 Terra Universal Inc. All rights reserved. • Revised August 2017 • Document No. 1800-93  Once window panels are plumb and level, standard wall panel construction can be resumed Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 13: Clamp Frame Door Installation

    For the door, form the “U” shape frame using the back profile, mect form the “U” using the front profile Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 14 Ensure the panel adjacent to the door is plumb and level  Fit cleanroom door adjacent to panel as per manufacturers guidelines Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 15 Cut 2 lengths of aluminum tongue to fit above the door frame to which the header panel will be fixed Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 16  Fix door clamp frame to side and header panels using suitable fixings Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 17: Wall Panel Installation

    After fixing the U frame into the wall panels, add the panel union to the wall panels over the U frame, and slide the door header panel to complete Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 18: Concealed Suspended Ceiling Installation

    Fixings must be fitted with a maximum span dependent on ceiling loading as per specification and at a maximum of 48” intervals Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 19 Cover strips should be attached with ¾” x 1/8” self-drilling, self-tapping screws at 1200 mm intervals 8" Hanging Plate Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 20: Coving Installation

     These must be fitted prior to the coving facing being applied Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 21: Specifications

    ISO 5 Materials Steel substrate walls uPVC wall coating 7.0 Warranty https://www.terrauniversal.com/warranty Thank you for ordering from Terra Universal! Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...

This manual is also suitable for:

6606-00

Table of Contents