Rear View; Installation Site; Transporting The Machine To Its Installation Site; Building Under A Continous Worktop / In A Kitchen Run - Miele T 8685 C Operating Instructions Manual

Table of Contents

Advertisement

Rear view

a Protruding lid for holding when
moving the machine (see arrows)
b Air inlet vent for cooling the
condenser unit
c Mains connection cable
d External drainage of the condensed
water
e Accessories for connection to a sink
drain outlet
f Slot for Miele|home communication
module

Installation site

,
Make sure the dryer door can be
opened without hindrance after
installation.
Transporting the machine to its
installation site
When moving the machine, you can
hold it by the lid where it protrudes to
the rear of the dryer. To manoeuvre the
dryer out of its packing case to its
installation site you will also need to
hold it by the front feet.
Building under a continous worktop /
in a kitchen run
,
A building-under kit* with a
coverplate to replace the machine
lid is required. It must be fitted by a
suitably qualified person to ensure
electrical safety.
N.B. If you wish to push your machine
under a worktop and there is space to
do this without removing the lid the
building under kit is not necessary.
Otherwise the building under kit is
essential.
– The building-under kit is supplied
with its own installation instructions.
– N.B. When built under drying times
may be longer.
– The electrical socket must be
located in an accessible position
near the machine.
With niche heights of:
– 830-840 mm, longer screw feet* are
required.
– 870-885 / 915-930 mm, one or two
raising kits* are required.
* accessory available to order
Replacing the lid
If the lid has been removed in order to
fit a coverplate, ensure that, if the lid is
ever replaced, it fits securely into the
rear holders. Otherwise, it is not
properly secure for transport.
Installation
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents