Advertisement

Quick Links

EN
HR95 UPPER
INSTALLATION

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HR95 UPPER and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for 2VV HR95 UPPER

  • Page 1 HR95 UPPER INSTALLATION...
  • Page 3: Before You Start

    It was assessed according to harmonized European standards listed in the relevant EC declaration of conformity were applied. For the current and full version of the EC declaration of conformity visit www.2vv.cz FCC CLASS A CERTIFICATION NOTE: This equipment has been tested and found to comply with the limits for a Class A digital device under Part 15 of the FCC Rules.
  • Page 4: Main Components

    SUPPLY FILTER BYPASS BYPASS EXTRACT FILTER EXTRACT FILTER HEAT RECOVERY EXCHANGER HEAT RECOVERY EXCHANGER MAIN SWITCH MAIN SWITCH CONDENSATE DRAIN CONDENSATE DRAIN EXHAUST FAN EXHAUST FAN SUPPLY FAN SUPPLY FAN 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 5: Technical Data

    2VV. Creating innovative solutions for you and your business since 1995.
  • Page 6 DIMENSIONS HR953-150UP 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 7 DIMENSIONS HR953-150UL 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 8 DIMENSIONS HR953-220UP 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 9 DIMENSIONS HR953-220UL 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 10 DIMENSIONS HR953-320UP 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 11 DIMENSIONS HR953-320UL 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 12 DIMENSIONS HR953-470UP 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 13 DIMENSIONS HR953-470UL 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 14: Installation

    (sizes 3200 and 4700) SAFE INSTALLATION DISTANCE Model a [mm] ALFA 95 1500U ALFA 95 2200U ALFA 95 3200U ALFA 95 4700U 1500 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 15 Screw the condensate tray with the rail to the central condensate tray. Make sure the rail is under the module tub not on top of it Refit the panels back onto the unit. 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 16 Slide the modules to the unit condensate tray with the rail. Make sure the rail is under the module tray not on top of it Refit the panels back onto the unit. 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 17: Electrical Installation

    If it is necessary to install a sensor or control element into the unit or on its housing, consult with the manufacturer or a representative of the unit beforehand 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 18 (3-4) HEAT PUMP CONTROL settable (output - ON/OFF) УПРАВЛЕНИЕ ТЕПЛОВОГО НАСОСА устанавливаемый (выход - ON/OFF) 2VV. Creating innovative solutions for you and your business since 1995. A (19,20) OUTPUT PERFORMANCE OF POSTHEATING (0-10V OR PWM) УПРАВЛЕНИЕ МОЩНОСТИ НАГРЕВАТЕЛЯ (0-10В или P...
  • Page 19 EXTERNAL TEMPERATURE SENSOR (external postheater - input) B (44-45) EXTERNAL TEMPERATURE SENSOR (adiabatic module / recirc. chamber - input) B (38-39) EXTERNAL PREHEATER (output - Water= 0-10V) B (36-37) EXTERNAL POSTHEATER (output - Water= 0-10V) 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 20: Control Panel

    • Any 0-10V sensor is supported. Advanced configurati- on is available for CO2 , RH, VOC. The advanced settings of these above mentioned inputs are described in the AirGENIO Superior OPERATIONAL manual. 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 21: Connecting Condensate Drain

    BMS control system ATTENTION! Before putting the unit into operation, fill in the trap with water!!! Otherwise there is a risk of flooding and damage to the unit. 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 22 INSTALLATION Unit with pre-heater and no post heater / water postheater / DX or VC coil Preheater-10,7KW I-BUS I-BUS I-BUS I-BUS JTAG JTAG NOT USED PRESSURE SENSORS RECIRCULATION POSTHEAT 2 PREHEAT 2 RELAY RELAY RELAY 1 2 3 4 5 6 7 8 NOT USED 1 2 3 4 5 6 7 8 NOT USED...
  • Page 23 1 2 3 ROTARY WHEEL ERROR RELAY RELAY RELAY RELAY FUSE RELAY 57 58 59 60 61 62 L2 L1 NC COM GNDPWM+10V L2 L1 NC COM GND PWM+10V 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 24: First Operation

    (ON= red OFF= green). After acti- vation, the display on the control panel lights up and data download will start. After complete download of these data, the unit is ready for operation. 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 25: Maintenance

    YOU WILL NEED 1) Open the cover 2) Remove the air filter 3) Replace the air filter according to the unit type 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 26 Location of the safety thermostat is indicated with RESET mark in each unit Push in the way of arrow in the picture above to reset the thermostat. 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 27 13 - Failure of rotary heat Failure of rotary heat exchan- connected to the electronics or check Unit is not working exchanger what type of error the heat exchanger is indicating. 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 28 Room temperature sensor connected to the electronics or test it water sensor of exchanger Unit is not working failure measuring its resistance (the resistance (T_WATER_OUT) value at +20°C is around 10kW) 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 29 Check the connection of the sensor. Set its address Check that it is not flooded. Replace if necessary. 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 30 37 - Condensate pan overflow Unit is not working an extremely high level of or whether the condensate drain is not water in the condenser's pan clogged, preventing the condensate from draining correctly. 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 31: Decommissioning Of The Product - Disposal

    (including electrical) • a detailed description of the fault and the steps you • have taken to rectify it Podrobný popis závady a kroky k jejímu odstranění • 2VV. Creating innovative solutions for you and your business since 1995.
  • Page 32 To use the heat recovery unit correctly and safely, you must read this manual and follow the instructions. For any questions or requests for clarification, please do not hesitate to contact our sales or technical support department. CONTACT Address 2VV, s.r.o., Fáblovka 568, 533 52 Pardubice, Czech Republic Internet : http://www.2vv.cz/...

Table of Contents