Material Handling Precautions and Storage precautions that must be followed. ADB SAFEGATE reserves the right to examine goods upon which a claim is made. Said goods must be presented in the same condition as when the defect therein was discovered. ADB SAFEGATE furthers reserves the right to require the return of such goods to establish any claim.
Page 4
Use this equipment only as described in the manual. ADB SAFEGATE cannot be held responsible for injuries or damages resulting from non-standard, unintended uses of its equipment. The equipment is designed and intended only for the purpose described in the manual. Uses not described in the manual are considered unintended uses and may result in serious personal injury, death or property damage.
1.0 Safety Introduction to Safety This section contains general safety instructions for installing and using ADB SAFEGATE equipment. Some safety instructions may not apply to the equipment in this manual. Task- and equipment-specific warnings are included in other sections of this manual where appropriate.
2.4.5.2 Remote control PCB (EPS495 or EP00047), all cabinets Note Until 2022, the CRE was delivered with the EPS495 board as the remote control PCB. Since 2022, the CRE has been delivered with the EP00047, and the EP00051 as an add-on board when Multiwire is required. The functionalities of these boards are equivalent in most cases, with the exception of the most demanding recent ALCMS systems with a redundant bus.
2.5.1 Remote control Note Until 2022, the CRE was delivered with the EPS495 board as the remote control PCB. Since 2022, the CRE has been delivered with the EP00047, and the EP00051 as an add-on board when Multiwire is required. The functionalities of these boards are equivalent in most cases, with the exception of the most demanding recent ALCMS systems with a redundant bus.
Disconnection devices 4.3 Prepare lightning protection 1. Examine the need for additional lightning protection. 2. If you need additional lightning protection, contact ADB Safegate to supply lightning diverters in accordance with IEC 61822. 4.4 Install power supply 1. Install a power supply for each equipment.
6.7 Remote Control PCB Note Until 2022, the CRE was delivered with the EPS495 board as the remote control PCB. Since 2022, the CRE has been delivered with the EP00047, and the EP00051 as an add-on board when Multiwire is required. The functionalities of these boards are equivalent in most cases, with the exception of the most demanding recent ALCMS systems with a redundant bus.
LED to CRE LOCREM. The LED is ON if there the equipment is in local mode LED to CRE REQCON. The LED is ON if the CS requests to switch on the equipment LED CSEFLT. The LED is ON if the circuit selector is faulty (CSE-FAULT) LED SP_UC1.
Our experienced engineers are available for support and service at all times, 24 hour/7 days a week. They are part of a dynamic organization making sure the entire ADB SAFEGATE is committed to minimal disturbance for airport operations. ADB SAFEGATE Support Technical Support –...
A.2.1.1 Local Authority Recycling The disposal of ADB SAFEGATE products is to be made at an applicable collection point for the recycling of electrical and electronic equipment. The correct disposal of equipment prevents any potential negative consequences for the environment and human health, which could otherwise be caused by inappropriate waste handling.
Need help?
Do you have a question about the CRE and is the answer not in the manual?
Questions and answers