Netbell-Ultra 300 Packing List and Wiring Instructions
1. Packing List
Netbell-Ultra 300 Server (01-910-00125) (1)
1M RJ45 Cable (01-390-00020) (1)
12VDC Power Supply (01-850-00006) (1)
DC 5.5*2.1MM TO USB-C 15CM (01-850-00120) (1)
Netbell-Ultra 300 Quick Setting Instruction
Packing List and Wiring Instructions
Safety Instructions
•
If the device is not powered via an Ethernet cable, use only the power adapter provided by Linortek that comes
with your order. Other power supplies may damage or destroy the device, affect its behavior, or induce noise.
•
Avoid placing the cables where people may trip over them or where they may be exposed to mechanical
pressure as this may damage them.
•
This device is for indoor use only! NOT FOR OUTDOOR USE!
•
Do NOT install the device in rooms with high humidity. Do NOT immerse the device in water and do NOT spill or
pour liquids of any kind onto or into the device.
•
Do NOT install the device in surroundings at risk for explosions. Do NOT use the device if you smell gas or other
potentially explosive fumes.
•
Do NOT use the device during thunderstorms. Lightning striking the power grid may cause electric shocks.
•
Do NOT remove the device's power supply (Ethernet cable when using PoE, power adapter when not using PoE)
when the RED LED is blinking and the GREEN LED is on (called Bootload state); a firmware update is ongoing.
Cutting off the device's power during a firmware update (red LED blinking, green LED on) will damage the
firmware and render the SERVER inoperative. In such cases, it will need to be returned to factory for resetting.
Product Manuals & Resources
To access the complete product manual, wiring instructions, and tutorial videos regarding the product setup and
configuration, please visit
the QR code with your smartphone to access the documentation.
https://bit.ly/01-910-00125
and click the Manuals & Resources tab. Alternatively, scan
1
Need help?
Do you have a question about the Netbell-Ultra 300 and is the answer not in the manual?
Questions and answers