Installation Is Complete - D-Link DUB-E100 Quick Installation Manual

Usb 2.0 fast ethernet adapter
Hide thumbs Also See for DUB-E100:
Table of Contents

Advertisement

Installation is Complete!

Installation of the DUB-E100 is complete. The LINK LED should be solid green, indicating
a good physical connection between the DUB-E100 and the network. The TX/RX LED
indicates when data is being transmitted or received. If both LEDs are unlit, there may be
a problem with the physical connection. Check the cables between your DUB-E100, the
computer, and the network. Verify that your network switch, hub, or router is powered on.
LINK LED:
Lights up solid green when the
DUB-E100 has a good physical
connection to the network.
TX/RX LED:
Flashes green when data is
transmitted/received at 100Mbps.
When data is transmitted/received
at 10Mbps the LED flashes amber.
10

Advertisement

Table of Contents
loading

Table of Contents