1. Installation Precautions Installation steps: Please follow the equipment installation steps process to ensure the equipment can be successfully installed. Start 1. Read the installation 2. Check the packing list 3. Tool preparation 4. Battery pack 5. Power cable 6. Communication 7.
2. Check the Packing List Start 1. Read the installation 2. Check the packing list 3. Tool preparation 4. Battery pack 5. Power cable 6. Communication 7. Equipment debugging manual installation connection connection Please refer to the packing items shown below, please check the packing list carefully, if any items are missing, please contact your dealer directly. Battery Anti tipping bracket Logger...
3. Tool Preparation Start 1. Read the installation 2. Check the packing list 3. Tool preparation 4. Battery pack 5. Power cable 6. Communication 7. Equipment debugging manual installation connection connection Step 2: Step 1: Installation Tools: tools needed in the process of installing Protective equipment products must be worn and maintained equipment, more e ective to improve installation e iciency.
4. Battery Pack Installation Start 1. Read the installation 2. Check the packing list 3. Tool preparation 4. Battery pack 5. Power cable 6. Communication 7. Equipment debugging manual installation connection connection There are two types of battery installation methods: floor installation and wall installation, Please refer to the corresponding installation manual separately. Step 1: Step 2: Step 3:...
5. Power Cable Connection Start 1. Read the installation 2. Check the packing list 3. Tool preparation 4. Battery pack 5. Power cable 6. Communication 7. Equipment debugging manual installation connection connection Installation Preparation: Before connecting cables, make sure the battery and inverter are entirely switched o . Make sure all breaker switches are fully switched o . Before connecting the power cables, using multi meter to measure cable continuity, short circuit, confirm positive and negative.
6. Communication Connection Start 1. Read the installation 2. Check the packing list 3. Tool preparation 4. Battery pack 5. Power cable 6. Communication 7. Equipment debugging manual installation connection connection Step 1: Step 2: Step 3: Connect the CAN communication line Connecting the RS485 communication line between two Connecting the RS485 communication line more than two batteries...
Page 8
7. Equipment Debugging Start 1. Read the installation 2. Check the packing list 3. Tool preparation 4. Battery pack 5. Power cable 6. Communication 7. Equipment debugging manual installation connection connection Step 1: Step 2: Step 3: Equipment power on Inverter Protocol Selection: Confirm Address Confirm again that the cables are connected in the correct...
Page 9
If you need any assistance, please get in touch. further 01274 833 115 info@infinityinnovations.co.uk www.infinityinnovations.co.uk Unit 3F, Acre Park, Dalton Lane, Keighley, BD21 4JH...
Need help?
Do you have a question about the HOME-ESS-LV-9.4K and is the answer not in the manual?