  • Page 2: Installation Precautions

    1.Installation Precautions Please follow the equipment installation steps process to ensure the The definition of each interface must be clear during the installation process, Flow chart of installation steps: Schematic diagram of battery interface: equipment can be successfully installed. otherwise the wrong connection will lead to installation failure or even damage to the equipment.
  • Page 3: Check The Packing List

    2.Check the Packing List Please refer to the packing items shown below, please check the packing list carefully, if any items are missing, please contact your dealer directly. Anti tipping bracket Logger Quick Installation Guide Battery RS485 communication CAN communication (可选配件,非标配件)...
  • Page 4: Tool Preparation

    3.Tool Preparation Step 1 : Protective equipment products must be worn and maintained during the installation process. Safety gloves Safety glasses Safety shoes Step 2 : Installation Tools: tools needed in the process of installing equipment, more effective to improve installation efficiency. Phillips screw driver Torque screw driver Hammer...
  • Page 5 Floor installation: Locating drill holes in the wall Using the Fit the expansion tube into the hole and There is a hook design on the back of the battery Step 1: Locate drill holes in the wall Step 2: Fix the anti tipping bracket Step 3: Fix the battery module bracket as a template, position the holes on pull tight, then use the expansion screw...
  • Page 6: Power Cable Connection

    5.Power Cable Connection Before connecting cables, make sure the battery and inverter are entirely switched off. Make sure all breaker switches are fully switched off. Installation Preparation: Before connecting the power cables, using multi meter to measure cable continuity, short circuit, confirm positive and negative. The area of the grounding cable shall be prepared at least 6mm , using a ground screw and terminal to connect the ground cable, which can ground the battery.
  • Page 7: Communication Connection

    When the inverter is electrically connected, the inverter and batteries need to be powered off. Hear a sound locking into place as the cable connects to the terminal. NOTE : It is forbidden to mix batteries of different brands, specifications and batches, otherwise it will cause system failure. 6.Communication Connection Use the CAN communication cable to connect the inverter to the battery's CAN port.
  • Page 8 The battery default factory CAN communication is Hanchu ESS protocol and RS485 communication is SRNE protocol. Step 2 : Inverter Protocol Selection: Protocol Selection: 1) Check which protocols are supported by the inverter;...