1.Installation Precautions The definition of each interface must be clear during the installation process, Schematic diagram of battery interface: Please follow the equipment installation steps process to ensure the Flow chart of installation steps: otherwise the wrong connection will lead to installation failure or even damage to equipment can be successfully installed.
2.Check the packing list Please refer to the packing items shown below, please check the packing list carefully, if any items are missing, please contact your dealer directly. Battery energy Distribution Unit: Battery energy Distribution Unit Anti tipping bracket*2 Installation base L-shaped hexagonal tool * 1 (BDU) (可选配件,非标配件)...
3.Tool preparation Step 1 : Protective equipment products must be worn and maintained during the installation process. Step 2 : Installation Tools: tools needed in the process of installing equipment, more effective to improve installation efficiency. Phillips screw driver Hammer Level 锤子...
Page 5
Floor installation: Fit the expansion tubes into the holes, pull Place the base along the wall and the base Step 1: Locate drill holes on the floor Step 2: Fix the base Install the module and BDU in order from bottom Step 3: Install the battery them tight, and then use the expansion screws distance from the wall is 25-48mm.
Page 6
Using the anti-tipping brackets as a template, Step 5: Locate drill holes on the wall There are screw holes on the left and right sides There are threaded holes on the left and Step 6: Fix the battery modules Step 4: Install the anti tipping bracket use a marker pen to locate on the wall, then drill of the battery system.
Page 7
5.Power cable connection and communication connection Before connecting cables, make sure the battery and inverter are entirely switched off. Make sure all breaker switches are fully switched off. Installation Preparation: Before connecting the power cables, using multi meter to measure cable continuity, short circuit, confirm positive and negative. Customer needs to prepare the area of the grounding cable shall be at least 6mm , use a ground screw and terminal to connect the ground cable, and ground the Step 1 :Connect the battery ground cable :...
Page 8
The battery default factory CAN communication is Hanchu ESS protocol. Step 2 : Inverter Protocol Selection: Protocol selection: 1) Check which protocols are supported by the inverter.