Download Print this page

Connection Of Pipes - Haier HSU-24LEB03 Installation Manual

Room air conditioner

Advertisement

Outdoor unit

1.Connection of pipes

To bend a pipe, give the roundness as large as possible not to crush the pipe
Connecting the pipe of gas side first makes working easier.
The max vertical distance between the indoor unit and the outdoor unit is 5 m.
Half union
Spanner
Be careful that matters, such as wastes of sands, etc. shall not enter the pipe.
2.Attaching Drain-Elbow
If the drain-elbow is used, please attach it as
figure. (Note: Only for heat pump unit.)
3.Purging Method:
Push the air out of the indoor unit and piping as followes:
Tighten the caps on the valves with specified torque.
Valve rod
Valve cap
When connecting pipe exceeds 5 meters, 60g refrigerant shall be added per
exceeding meter. Charge according to the following list.
Piping length
Additional amount
Indoor unit
A
B
Outdoor unit
Max.Elevation:B=10m
Max. Length:A=20m
Outdoor unit
Flare nut
Torque wrench
Tighten torque N.m
7-9
20-25
for
5m
No need
A
Outdoor unit
B
Indoor unit
Forced fastening without careful centering
may damage the threads and cause a
leakage of gas.
Pipe Diameter (
Liquid side 9.52mm(3/8")
Gas side 15.88mm(5/8")
24k 30k 32k
36k
7m
10m
300g
120g
Outdoor unit
CAUTION
In case more than 5 metres,oil trap
should be installed every 5~7m.
4
Fastening torque
)
40N.m
60N.m
20m
900g
A
Oil trap
C
Indoor unit
B
C

Advertisement

loading