Page 2
• SLA-R18-190D/N4A4 • SLA-R18-190D/N4A4C Position the heat pump on a flat sturdy surface. Fix the tube joint and fit condensation tube to overflow port. Run it to a suitable drainage location. Connect water supply to the water inlet. Connect hot water outlet and PTR valve. Connect supply water pipe and hot water pipe to the tempering valve.
Page 3
• SLA-R25-250D/N4D4 • SLA-R25-300D/N4D4 • SLA-R25-250D/N4D4C • SLA-R25-300D/N4D4C Position the heat pump on a flat sturdy surface. Fix the tube joint and fit condensation tube to overflow port. Run it to a suitable drainage location. Connect water supply to the water inlet. Connect hot water outlet and PTR valve.
Page 4
(if required) cost may increase due to need to move and then return unit to original position. Enclosed room installation SLA-R18-190D/N4A4: the minimum area = 25m SLA-R25-250D/N4D4, SLA-R25-300D/N4D4: the minimum area = 32.5m Unit dimension Model SLA-R18-190D/N4D4 510mm 2175mm SLA-R25-250D/N4D4 640mm 1800mm...
Need help?
Do you have a question about the SLA-R18-190D/N4D4 and is the answer not in the manual?
Questions and answers