INSTALLATION
MANUAL
CDR - Cable Distribution Rack
Table of contents
•
REQUIRED TOOLS ........................................................................................................ 1
•
•
•
•
•
•
•
•
•
•
•
ASSEMBLY OF CDR1500 ............................................................................................ 21
•
•
•
MOUNTING OF CAGE NUT ......................................................................................... 26
•
•
•
•
•
•
•
•
•
REQUIRED TOOLS
Step 1
Flat combined open-end wrench 12mm /
screwdriver 6 supplied together with rack
HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and
accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product warranty provided by
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the
general handling of these products please contact HUBER+SUHNER.
Step 2
• Long PZ / Phillips #2
• PZ / Phillips #3
• Combination spanner AF=
10 mm (M6) and 17mm (M10)
HUBER+SUHNER AG
Fiber Optics
Fiber Management Systems
DOC-0000719356 Rev G
Date: 20/12/2018
Page 1 of 35
Step 3
Tools for mounting CDR on a fixed or raised floor