620073775 – ABS Pre-Chiller, 115V, 60Hz, R290 620073774 – ABS Pre-chiller, 230V, 50Hz, R290 Release Date: March 6, 2023 Publication Number: 620073775MNL Revision Date: March 6, 2023 Revision: A Visit the Cornelius web site at www.cornelius.com for all your Literature needs.
Page 2
This Product is warranted only as provided in Cornelius’ Commercial Warrant applicable to this Product and is subject to all of the restrictions and limitations contained in the Commercial Warranty.
ABS 2.0 Pre-Chiller Service Manual SAFETY INSTRUCTIONS OLLOW AFETY NSTRUCTIONS Safety Overview ALL SAFETY INSTRUCTIONS • Read and follow in this manual and any warning/caution labels on the unit (decals, labels or laminated cards). • Read and understand ALL applicable OSHA (Occupational Safety and Health Administration) safety regulations before operating this unit.
Page 5
ABS 2.0 Pre-Chiller Service Manual UALIFIED ERVICE ERSONNEL WARNING: Only trained and certified electrical and refrigeration technicians should service this unit. ALL WIRING AND PLUMBING MUST CONFORM TO NATIONAL AND LOCAL CODES. FAILURE TO COMPLY COULD RESULT IN SERIOUS INJURY, DEATH OR EQUIPMENT DAMAGE. IF THE SUPPLY CORD IS DAMAGED, IT MUST BE REPLACED BY THE MANUFACTURER, ITS SERVICE AGENT OR SIMILARLY QUALIFIED PERSONS IN ORDER TO AVOID A HAZARD.
Page 6
ABS 2.0 Pre-Chiller Service Manual R290 R EFRIGERANT RECAUTIONS WARNING! R290 Refrigerant used in this dispenser is flammable. Follow the Warnings listed below to avoid hazards. DANGER: Risk Of Fire or Explosion. Flammable Refrigerant Used. Do Not Use Mechanical Devices To Defrost Refrigerator. Do Not Puncture Refrigerant Tubing.
Page 7
ABS 2.0 Pre-Chiller Service Manual WARNING: Do not use means to accelerate the defrosting process or to clean, other than those recommended by the manufacturer. The appliance shall be stored in a room without continuously operating ignition sources (for example: open flames, an operating gas appliance or an operating electric heater.
INSTALLATION DETAILS & REFERENCE INFORMATION Nameplate Data Refrigerant Test Pressure PSI (kPa) (Bar) Pre-Chiller Pre-Chiller Shipping Weight Grams Type High Side Low Side 620073775 115V 4.23 R-290 425 (2930.3) (29.3) 170 (1172.1) (11.7) 189 lbs (85.7kg) 620073774 230V 5.29 R-290 DANGER: Only trained and certified electrical/HVAC technicians should service the electrical components and wiring connections in the pre-chiller unit.
Page 10
ABS 2.0 Pre-Chiller Service Manual INSTALLATION Assembly Instructions Table 2 Step Action Place the glide strips on the frame of the cabinet (rails must be clean and dry). Figure 3 Place the “L” nut on one of the carbonated water lines and clamp.
Page 11
ABS 2.0 Pre-Chiller Service Manual INSTALLATION ABS 2.0 P COOLER NSTALLATION Table 3 Step Action Remove nozzle housing bracket by remov- ing 2 screws. Nozzle Housing Screws Figure 6 A. Place the Pre-Cooler unit in the ABS 2.0 lower cabinet. If the electrical outlets are behind the ABS, plug the power cords in before the Pre-cooler is installed.
Page 12
ABS 2.0 Pre-Chiller Service Manual Table 3 Step Action Route and connect the three labeled 1/2- inch [12.7 mm] I.D. carbonated and plain water tubing from the ABS 2.0 unit to the Pre-cooler. The tubing is individually insu- lated and labeled as being WATER and CAR- BONATED WATER, the connections on the Pre-cooler are also marked as being WATER and CARBONATED WATER...
Page 16
ABS 2.0 Pre-Chiller Service Manual External Water Connections Four (4) water lines from the ABS 2.0 unit extend to the pre-chiller unit in the left-side location indicated below. These water lines support the cooling capacity of the external devices. Accessories to connect external devices are not included. Connections should be performed by a certified installer.
ABS 2.0 Pre-Chiller Service Manual COMPONENT LOCATIONS Refer to the following figures for system component locations. Figure 17 1) Refrigeration Compressor 2) Start Tower (115V Compressor only) (Capacitor/Relay on back of bracket) 3) Global Ice Bank Controller 4) Electrical Box 5) Condenser 6) Condenser Fan 7) TXV (Expansion) Valve...
ABS 2.0 Pre-Chiller Service Manual PRE-CHILLER ACCESS AND REMOVAL The Pre-chiller is located in the lower-right compartment of the ABS 2.0 Dispenser unit. Its components are mounted on a steel pan (refrigeration base) that slides out of the unit to allow access. For major maintenance or repairs, the entire chiller system may be lifted and removed using an hydraulic hand-truck.
ABS 2.0 Pre-Chiller Service Manual MAINTENANCE Perform these procedures to ensure that the ice bank has the proper water level and that the condenser debris filter is not impeding air flow. Frequency: Every Three Months Table 4 Step Action Disconnect electrical power from the pre-chiller. Remove the two screws securing the access cover atop the ice bank.
ABS 2.0 Pre-Chiller Service Manual TROUBLESHOOTING The guide below provides Causes and Corrective Actions with respect to malfunctions related to a reduction or loss of water- cooling capacity. NOTE: Since troubleshooting and repair/replacement procedures to be performed on the pre-chiller must be conducted by a qualified/certified, HVAC repair technician (or in some cases an MFT Field Service Engineer), already trained in applicable diagnostic and corrective procedures, this manual provides only general procedural and safety guidelines relevant to them.
Page 32
ABS 2.0 Pre-Chiller Service Manual TROUBLESHOOTING Perform the following checks to evaluate refrigeration system operation. WARNING: Only trained and certified electrical, plumbing and refrigeration technicians should diagnose and service this unit. ALL WIRING AND PLUMBING MUST CONFORM TO NATIONAL AND LOCAL CODES. FAILURE TO COMPLY COULD RESULT IN SERIOUS INJURY, DEATH OR EQUIPMENT DAMAGE.
Page 33
ABS 2.0 Pre-Chiller Service Manual TROUBLESHOOTING Refrigeration Compressor Check DANGER: Disconnect power to the unit before servicing. Follow all lock out/tag out procedures established by the user. Verify all power is off to the unit before performing any work. Failure to comply could result in serious injury, death or damage to the equipment.
Page 34
ABS 2.0 Pre-Chiller Service Manual TROUBLESHOOTING Expansion Valve Check A thermostatic expansion valve is used to control the amount of refrigerant flowing through the evaporator (ice bank refrigeration coils). Improperly installed or defective expansion valves may cause deficient cooling. By using general refrigeration system troubleshooting along with the pressure charts you can easily determine whether or not the expansion valve is working properly.
ABS 2.0 Pre-Chiller Service Manual COMPONENT REPLACEMENT Follow these instructions to replace selected components. For refrigeration-system components, only essential guidelines are provided. WARNING: Only trained and certified electrical, plumbing and refrigeration technicians should diagnose and service this unit. ALL WIRING AND PLUMBING MUST CONFORM TO NATIONAL AND LOCAL CODES. FAILURE TO COMPLY COULD RESULT IN SERIOUS INJURY, DEATH OR EQUIPMENT DAMAGE.
Page 36
ABS 2.0 Pre-Chiller Service Manual COMPONENT REPLACEMENT When transferring refrigerant into cylinders, ensure that only appropriate refrigerant recovery cylinders are employed. Ensure that the correct number of cylinders for holding the total system charge is available. All cylinders to be used are designated for the recovered refrigerant and labeled for that refrigerant (i.e.
Page 37
Discharge capacitors in a way that won’t cause any spark, using a Supco CapDis tool. Refrigerant Test Pressure PSI (kPa) (Bar) Pre-Chiller Pre-Chiller Shipping Weight Grams Type High Side Low Side 620073775 115V 4.23 R-290 425 (2930.3) (29.3) 170 (1172.1) (11.7) 189 lbs (85.7kg) 620073774 230V 5.29 R-290 When BRAZING is required, the following procedures shall be carried out in the order indicated: A) Remove the refrigerant.
ABS 2.0 Pre-Chiller Service Manual COMPONENT REPLACEMENT Disposal Ensure sufficient ventilation in the work area. Remove the refrigerant. Where controlled, refrigerant-recovery is required, follow all local regulatory guidelines and requirements. Where refrigerant recovery is not required by local/national regulations, drain the refrigerant to the outside. Take care that the drained refrigerant will not cause any danger.
ABS 2.0 Pre-Chiller Service Manual COMPONENT REPLACEMENT Ice Bank Controller Replacement Table 7 Step Action Disconnect electrical power from the pre-chiller. Mounting bracket NOTE: Four (4) is slotted left to sockets for wiring right.(Note harness connector bracket in Fig. 43). plug-in.
ABS 2.0 Pre-Chiller Service Manual COMPONENT REPLACEMENT Ice Probe Replacement Table 8 Step Action Disconnect electrical power from the pre-chiller. Drain the pre-chiller reservoir water using the manual drain on the underside of the unit (or pump it out). Disconnect the chiller electrical and plumbing lines. (Refer to PRE-CHILLER ACCESS AND REMOVAL section.) Unlock and slide out and remove the chiller from the ABS 2.0 compartment using an hydraulic lift-truck.
ABS 2.0 Pre-Chiller Service Manual COMPONENT REPLACEMENT Agitator Motor Replacement Table 9 Step Action Disconnect electrical power from the pre-chiller. Drain or partially drain the reservoir to reduce weight. Disconnect the chiller electrical & plumbing lines. (Refer to PRE-CHILLER ACCESS AND REMOVAL section.) Unlock and slide the pre-chiller out enough to allow access to the Agitator motor shown below.
ABS 2.0 Pre-Chiller Service Manual COMPONENT REPLACEMENT Condenser Fan Replacement Table 10 Step Action Disconnect electrical power from the pre-chiller. Drain or partially drain the reservoir to reduce weight. Disconnect the chiller electrical & plumbing lines. (Refer to PRE-CHILLER ACCESS AND REMOVAL section.) Unlock and slide the pre-chiller out enough to allow access to the Agitator motor shown below.
ABS 2.0 Pre-Chiller Service Manual COMPONENT REPLACEMENT Start Capacitor (230V) / Start Tower (115V) Replacement NOTE: The start capacitor in 230V units may be replaced individually; but for 115V units, capacitor replacement entails replacing the Start Tower assembly as a unit Table 11 Step Action...
Page 46
ABS 2.0 Pre-Chiller Service Manual Table 11 Step Action Start Tower Junction Boxes 115V units (from here onward) Open the Tower junction boxes as shown at right. Safely discharge the capacitor using a Supco CapDis tool across the applicable junction box terminals 1, 2 and 4 as shown in the junction-box cover diagram at right (or Blue/...
Page 47
Marmon Foodservice Technologies Inc. www.marmonfoodservice.com www.cornelius.com...