Ulma LADD MINI Installation And Maintenance Instructions Manual

25kw

Advertisement

Quick Links

INSTALLATION AND MAINTENANCE INSTRUCTIONS
ULMA LADD MINI
25KW

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LADD MINI and is the answer not in the manual?

Questions and answers

Summary of Contents for Ulma LADD MINI

  • Page 1 INSTALLATION AND MAINTENANCE INSTRUCTIONS ULMA LADD MINI 25KW...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS Contents Page Technical data Information Description of the project Accessories Installation Boiler room & chimney Care and maintenance Dimensions Warranty...
  • Page 3: Technical Data

    The product is CE marked, which means that it meets all the established requirements for the product to be used in the EU. ULMA AB disclaims all liability that may arise from misuse or improper use of the boiler. TECHNICAL DATA...
  • Page 4: Information

    SERVICE CONTRACTS INCREASE BOILER UPTIME AND LIFETIME ULMA AB recommends that an annual service contract is taken out to extend both the operating life and the service life of the burner. Contact your dealer for more information.
  • Page 5: Description Of The Project

    The Ulma boiler must be operated with an Ulma TCA or ECO pellet burner. The boiler has a water volume of 29 liters and should be connected to an accumulator tank of at least 150 liters.
  • Page 6: Installation

    INSTALLATION On the back of the boiler is the flue connection and the electrical connection. Overheat protection RADIATOR SYSTEMS AND EXPANSION VESSELS Fill the system with all valves open and the circulation pump off. Bleed the system during filling. After a few days of operation, bleed and refill. Follow special instructions for water refilling.
  • Page 7 PLANNING AND INSTALLATION WORK The planning and installation work of the plant must be carried out in a professional manner in compliance with general and local rules and regulations. The maximum working pressure is 3 bar. Before the installation is put into operation and always at the beginning of the heating season, the following checks must be carried out: 1.
  • Page 8: Boiler Room & Chimney

    CHIMNEY CONNECTION The ULMA BOILER is designed for high efficiency through its combustion chamber and flue gas ducts. The boiler should be connected to the chimney with the supplied swivel flue installed horizontally, and the flue should never be directed downwards.
  • Page 9: Care And Maintenance

    CARE AND MAINTENANCE FLAT CLEANING In ULMA PANNAN, maintenance has been minimized through a well-thought-out design and the large ash box that holds about 50 liters. Ash removal is carried out as needed. The boiler tubes are cleaned as needed. Closer intervals provide increased efficiency.
  • Page 10: Dimensions

    DIMENSIONS v i r ä " 1 n . t " 1 n . t n . t ö J...
  • Page 11: Warranty

    ULMA AB within two weeks of installation. Annual service is mandatory and a service report must be presented in case of complaints. Without these documents and actions, the warranty is invalid.
  • Page 12 Ulma AB +46 (0)325 - 176 80  �� Energy Street 11 info@ulma.se ✉ 512 53 Svenljunga www.ulma.se  SWEDEN...