Trox Technik DID614 Installation Manual

Trox Technik DID614 Installation Manual

Active chilled beams

Advertisement

Product overview
Fig. 1: Schematic illustration of DID614
Hanging brackets
Primary air spigot
Casing
Nozzle plate with punched nozzles
Air control blades (optional)
Installation manual
Active chilled beams
Type DID614
Active chilled beams Type DID614
GB/en
Water connections
Encasing (optional)
Heat exchanger
Front frame
Induced air grille
TROX GmbH
Heinrich-Trox-Platz
D-47504 Neukirchen-Vluyn
Phone: +49 (0) 2845 202-0
Fax: +49 (0) 2845 202-265
E-mail: trox-de@troxgroup.com
Internet: http://www.trox-
technik.com
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DID614 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Trox Technik DID614

  • Page 1 Phone: +49 (0) 2845 202-0 Fax: +49 (0) 2845 202-265 Active chilled beams E-mail: trox-de@troxgroup.com Internet: http://www.trox- technik.com Type DID614 Product overview Fig. 1: Schematic illustration of DID614 Hanging brackets Water connections ① ⑥ Primary air spigot Encasing (optional) ②...
  • Page 2: General Information

    Project-specific documents (if any)  NOTICE! Potentially hazardous situation which, if not avoided, may result in property damage. ENVIRONMENT! Environmental pollution hazard. Tips and recommendations Useful tips and recommendations as well as information for efficient and fault-free operation. Active chilled beams Type DID614...
  • Page 3 – in humid rooms; Product name  – in rooms with aggressive or dust-laden air. TROX order number  Delivery date  Brief description of the fault  Online www.troxtechnik.com Phone +49 2845 202-400 Active chilled beams Type DID614...
  • Page 4 The work described in this manual has to be car- their assigned duties, understand any potential haz- ried out by individuals with the qualification, training, ards related to the work under consideration, and knowledge and experience described below: recognise and avoid any risks involved. Active chilled beams Type DID614...
  • Page 5: Technical Data

    If the temperature falls below the dew point, con- densate will cause water damage to the device or building. Adjust the chilled water flow temperature so that it cannot fall below the dew point. Active chilled beams Type DID614...
  • Page 6 20.5 17.0 23.0 19.0 25.0 Supply air spigot Z Installation subframe ERS Contained water WÜ Dimensions [mm] Dimensions [mm] Width of heat exchanger B 1000 1000 1125 1125 1065 1250 1250 1190 Dimensions [mm] ØD Active chilled beams Type DID614...
  • Page 7 26.5 24.0 29.5 26.0 32.0 Supply air spigot Z Installation subframe ERS Contained water WÜ Dimensions [mm] Dimensions [mm] ØD 1000 1000 1125 1125 1065 1250 1250 1190 Dimensions [mm] Width of heat exchanger B Active chilled beams Type DID614...
  • Page 8: Transport And Storage

    Use only lifting and transport gear designed for the required load. Always secure the load against tip- ping and falling. Upon delivery, carefully remove the packaging and check the unit for transport damage and complete- ness. Active chilled beams Type DID614...
  • Page 9 Plasterboard ceiling ② Fig. 5: Ceiling installation, T-bar DID614 ① Ceiling tile ② Fig. 6: Ceiling installation, clamping profile DID614 ① Ceiling tile ② Fig. 7: Ceiling installation, concealed T-bar ① DID614 Ceiling tile ② Active chilled beams Type DID614...
  • Page 10 Use all hanging brackets supplied. – Stand clear of suspended loads, unless properly secured. – Check secure fixing after installation. Fig. 11: Assembly step 3 Fig. 9: Assembly step 1 Fig. 12: Assembly step 4.1 Active chilled beams Type DID614...
  • Page 11 InstallationOperation Adjusting the nozzles The DID614 is fitted with adjustable twin noz- zles that allow for adapting the airflow velocity to changed operating conditions at a later stage, if required. CAUTION! Hot surfaces! Fig. 13: Assembly step 4.2 Danger of burn injuries when working on the hot...
  • Page 12 InstallationOperation Fig. 15: DID614 nozzle adjustment Loosen the Allen screws (SW4) (Fig. 14/4) of the flat adjustment bar (Fig. 14/1). Fig. 16: Changing the air discharge pattern Slide the flat adjustment bar back or forth to open or close the nozzles, as required: small nozzle open (Fig.
  • Page 13 Solder joint (rigid) Flexible hoses External thread G 1/2" (flat 22 Screw connection seal) (rigid) Flexible hoses Union nut G 1/2" (flat seal) 24 Screw connection (rigid) Flexible hoses We recommend connecting with flexible hoses (accessories) Active chilled beams Type DID614...
  • Page 14: Initial Commissioning

    The water quality must be monitored and docu- water quality in order to ensure the long-term mented at regular intervals to prevent corrosion. operation of the system. Active chilled beams Type DID614...
  • Page 15: Maintenance And Cleaning

    After cleaning, reattach the safety cables, and screw-fix and close the grille. CAUTION! Danger of head injuries from the fall of the induced air grille! Check that the induced air grille and safety cables are securely fixed! Active chilled beams Type DID614...

This manual is also suitable for:

Did614-4-s2-r/593x593-158/le

Table of Contents