The general delivery terms apply to warranty ards and avoiding them on their own. claims. For purchase orders placed with TROX GmbH, see Section VI, Warranty Claims, of the Trained personnel Delivery and Payment Terms of TROX GmbH, Trained personnel are individuals who have suffi- www.trox.de/en/.
Technical data Technical data Description Value Cooling capacity up to approx. 1000 W Max. operating pressure, water side 6 bar Max. operating temperature 75 °C (55 °C, when using flexible connecting hoses) Minimum operating temperature 6 °C Dimensions Fig. 2: Dimensions PKV Weights [kg] Variant L [mm]...
Page 4
Technical data Weights [kg] Variant L [mm] [mm] 1000 1500 2000 2500 3000 Contained water Dimensions [mm] 1000 1500 1100 2000 1400 2500 1700 3000 1800 Dimensions [mm] Dimensions [mm] Passive chilled beams Type PKV...
Transport and storage Transport and storage Storage Please note: Transport Store the unit only in its original packaging CAUTION! Protect the unit from the effects of weather Protect the unit from humidity, dust and con- Danger of injury from sharp edges, sharp cor- tamination ners and thin sheet metal parts! Storage temperature: –10 to 50 °C...
Page 6
InstallationOperation Installation Ceiling installation Personnel: Trained personnel Protective equipment: Industrial safety helmet Safety shoes Protective gloves The PKV can be installed freely suspended or above an open cell ceiling. Only work in pairs; preferably use a lift! Fig.
Page 7
InstallationOperation Connecting the water pipes CAUTION! Hot surface! Danger of burn or scald injuries when working on the hot water system. Before working on the water-side connections, shut down the system, depressurise it and let it cool down. The heat exchanger is fitted with one water flow and one water return connection.
Page 8
InstallationOperation NOTICE! Damage to heat exchanger or pipe network! Always use a suitable tool to counter the tight- ening force in order to prevent any damage! Fig. 9: Tightening the connection Tighten threaded connections with a spanner. NOTICE! Damage to the heat exchanger due to frost! Only fill the heat exchanger if there is no danger of freezing! Passive chilled beams Type PKV...
Initial commissioning Initial commissioning Pressure testing Before you start commissioning, check the following points: A pressure test must be carried out pneumatically or hydraulically in closed water-based heating and Check that the cooling panels are fitted cor- chilled or cooling water circuits in accordance with rectly the general rules of technology or BTGA 3.002, Remove protective film, if any...
Maintenance and cleaning Maintenance and cleaning Cleaning the heat exchanger Maintenance CAUTION! The water quality may change during operation. The water quality must be monitored and docu- Hot surfaces! mented at regular intervals to prevent corrosion. Danger of burn injuries when working on the hot water system! Cleaning Before working on the water-side connections,...
Need help?
Do you have a question about the PKV Series and is the answer not in the manual?
Questions and answers