Page 1
Active chilled beams E-mail: trox-de@troxgroup.com Internet: http://www.trox- technik.com Type DID-E2 Product overview Fig. 1: Schematic illustration DID-E2-VC Primary air spigot Ventilation grille for supply air (optional) Terminal box for electrical connection of Hot water circuit volume flow controller (only with version VC)
Project-specific documents (if any) NOTICE! Potentially hazardous situation which, if not avoided, may result in property damage. ENVIRONMENT! Environmental pollution hazard. Tips and recommendations Useful tips and recommendations as well as information for efficient and fault-free operation. Active chilled beams Type DID-E2...
Page 3
Safety notes may refer to individual instructions. The general delivery terms apply to warranty In this case, safety notes will be included in claims. For purchase orders placed with TROX the instructions and hence facilitate following the GmbH, see "Section VI, Warranty Claims", of the instructions.
Page 4
The work described in this manual has to be car- their assigned duties, understand any potential haz- ried out by individuals with the qualification, training, ards related to the work under consideration, and knowledge and experience described below: recognise and avoid any risks involved. Active chilled beams Type DID-E2...
If the temperature falls below the dew point, con- densate will cause water damage to the device or building. Adjust the chilled water flow temperature so that it cannot fall below the dew point. Active chilled beams Type DID-E2...
Page 6
Technical data Dimensions and weights Fig. 2: Dimension drawing DID-E2 with supply air spigot (-Z) and without volume flow controller, DID-E2-4 shown Ø12 mm pipe, plain tails G½" external thread and flat seal G½" union nut and flat seal Weights (4L, 123, R+L) [kg]...
Page 7
Technical data Fig. 3: Dimensional drawing DID-E2 with supply air spigot (-Z) and with volume flow controller (-VC), DID-E2-4 shown Ø12 mm pipe, plain tails G½" external thread and flat seal G½" union nut and flat seal Weights (4L, 123, R+L) [kg]...
Use only lifting and transport gear designed for the required load. Always secure the load against tip- ping and falling. Upon delivery, carefully remove the packaging and check the unit for transport damage and complete- ness. Active chilled beams Type DID-E2...
Page 9
Insert the device Fasten the device with threaded rods Ä Ä Chapter 4 ‘Technical Fig. 5: Dimensions / Ä Ä Chapter 4 ‘Technical data’ data’ on page 5 on page 5 Width of heat exchanger B Active chilled beams Type DID-E2...
Page 10
Connect the ductwork Ä Fig. 7. lation device Active chilled beams DID-E2 have an outdoor air or primary air spigot. Fig. 7: DID-E2 installation example, without grille Sliding spigot for supply air (optional)
Page 11
(3) with securing sheets (1) Securing sheet on the installation subframe and grille. Screw Safety cable L-bracket Installation subframe Bulkhead Fig. 8: Installation subframe individual parts Securing sheet Screw Safety cable L-bracket Installation subframe Active chilled beams Type DID-E2...
Page 12
H = Grille height to be ordered Installation opening without installation sub- frame L = Grille length to be ordered: L - 15 mm H = Grille height to be ordered: H - 15 mm Active chilled beams Type DID-E2...
Page 13
InstallationOperation Fig. 13: DID-E2 bulkhead – air intake through open shadow gap Minimum distance 50 mm, for distances between 50 and 150 mm, a reduction in per- formance of approx. 10% is expected, recom- mended distance ≥150 mm. Plasterboard bulkhead (provided by others)
Page 14
Flexible hoses External thread G 1/2" (flat 22 Screw connection seal) (rigid) Flexible hoses Union nut G 1/2" (flat seal) 24 Screw connection (rigid) Flexible hoses We recommend connecting with flexible hoses (accessories) Active chilled beams Type DID-E2...
Filling and supplemental water must be filled into the system with the appropriate water quality in order to ensure the long-term operation of the system. Active chilled beams Type DID-E2...
The water quality must be monitored and docu- mented at regular intervals to prevent corrosion. Cleaning Observe the following points when cleaning: Clean surfaces with a damp cloth. Use only common household cleaners, do not use any aggressive cleaning agents. Active chilled beams Type DID-E2...
After cleaning, screw-fix the grille and close the cleaning opening. CAUTION! Danger of head injuries from the fall of the induced air grille! Check that the induced air grille is securely fixed! Active chilled beams Type DID-E2...
Need help?
Do you have a question about the DID-E2 and is the answer not in the manual?
Questions and answers