Advertisement

S4200 Installation Guide
Chapter 1 Introduction ............................................................. 1-1
1.1 Product Brief ................................................................................... 1-1
1.2 Physical Specifications .................................................................. 1-2
1.3 Description of Hardware ................................................................ 1-2
1.3.1 Front Panel............................................................................................... 1-2
1.3.2 Back Panel ............................................................................................... 1-3
1.3.3 Status LEDs ............................................................................................. 1-4
1.3.4 Front Panel Port Description ................................................................. 1-7
Chapter 2 Hardware Installation .............................................. 2-1
2.1 Installation Notice ........................................................................... 2-1
2.1.1 Environmental Requirements ................................................................ 2-1
2.1.2 Installation Notice ................................................................................... 2-4
2.1.3 Security Warnings ................................................................................... 2-4
2.2 Installation Preparation .................................................................. 2-5
2.2.1 Verify the Package Contents .................................................................. 2-5
2.2.2 Required Tools and Materials ................................................................ 2-5
2.3 Installation Guide ............................................................................ 2-6
2.3.1 Installing the Switch ............................................................................... 2-6
2.3.2 Connecting Console ............................................................................... 2-7
2.3.3 SFP Transceiver Installation .................................................................. 2-7
2.3.4 Copper Cable/Fiber Cable Connection ................................................. 2-7
2.3.5 Power Supply Connection ..................................................................... 2-8
Content
1
Content

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S4200 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for DCN S4200 Series

  • Page 1: Table Of Contents

    S4200 Installation Guide Content Content Chapter 1 Introduction ............. 1-1 1.1 Product Brief ................... 1-1 1.2 Physical Specifications ..............1-2 1.3 Description of Hardware ..............1-2 1.3.1 Front Panel....................1-2 1.3.2 Back Panel ....................1-3 1.3.3 Status LEDs ..................... 1-4 1.3.4 Front Panel Port Description ..............
  • Page 2: Chapter 1 Introduction

    Chapter 1 Introduction 1.1 Product Brief S4200 series switches are 1000Mb uplink layer 2 switches. This series of switches includes 4 models, as listed below. S4200-10P-SI provides 10 fixed ports (8 10/100/1000Base-T fixed ports, 2 Gigabit SFP ports); S4200-10P-PL-SI provides 10 fixed ports (8 10/ 100/1000Base-T fixed ports, 2 Gigabit SFP ports), and support 8 Gigabit ports of POE power supply;...
  • Page 3: Physical Specifications

    S4200 Installation Guide Chapter 1 Introduction Fig 1-4 S4200-28P-PL-SI Switch 1.2 Physical Specifications  Management Port 1 RJ-45 serial console port  AC Power Input 100 ~ 240VAC, 50Hz ~ 60Hz  Power Consumption S4200-10P-SI: <8W S4200-10P-PL-SI: When non-POE power supply<8W, POE power output<=70W S4200-28P-SI R2: <20W S4200-28P-PL-SI R2: When non-POE power supply <30W, POE power output <=200W...
  • Page 4: Back Panel

    S4200 Installation Guide Chapter 1 Introduction Gigabit SFP ports, 1 Console port, and 1 240V AC power socket. The front panel of S4200-10P-SI is shown as follow: Fig1-5 Front Panel of S4200-10P-SI The front panel of the S4200-10P-PL-SI switch has 8 10/100/1000Base-T ports, 2 Gigabit SFP ports, 1 Console port, 10 LED Link indicators, and 8 LED POE Status indicators .
  • Page 5: Status Leds

    1 grounding screw. Fig 1-12 Back Panel of S4200-28P-PL-SI 1.3.3 Status LEDs S4200 series switches include port indicator and system status indicator, as shown in below and described in the following table. 1.3.3.1 Port Indicator Description Fig 1-13 S4200-10P-SI LED diagram...
  • Page 6 S4200 Installation Guide Chapter 1 Introduction Fig 1-14 S4200-10P-PL-SI LED diagram Panel Symbol Status Description On (Green) The port is linked successfully port linked successfully, Port1-8(Link/Act) Flash (Green) receive/send data The port is not link On (Green) SFP port is linked successfully SFP port is linked successfully, and Port9-10(Link/Act) Flash (Green)
  • Page 7 S4200 Installation Guide Chapter 1 Introduction Fig 1-16 S4200-28P-PL-SI LED diagram Panel Symbol Status Description On (Green) The port is linked successfully port linked successfully, Port1-24(Link/Act) Flash (Green) receive/send data The port is not link On (Green) SFP port is linked successfully SFP port is linked successfully, and Port25-28(Link/Act) Flash (Green)
  • Page 8: Front Panel Port Description

    S4200 Installation Guide Chapter 1 Introduction The internal power supply is working On (Green) properly. Flash(Green) System is normal The power supply is not powered on or the power supply is broken. Table 1-6 S4200-10P-PL-SI system indicator description Fig 1-19 S4200-28P-SI system LED diagram Status Description The internal power supply is working...
  • Page 9 S4200 Installation Guide Chapter 1 Introduction Table 1-9 S4200 port description Interface mode Spec  RJ-45 port 10/100/1000Mbps auto negotiation  MDI/MDI-X cable mode auto negotiation  5 kinds of UTP: 100 m  SFP-SX-L transceiver 1000Base-SX SFP(850nm, MMF, 550m) ...
  • Page 10: Chapter 2 Hardware Installation

    S4200 Installation Guide Chapter 2 Hardware Installation Chapter 2 Hardware Installation 2.1 Installation Notice To ensure the proper operation of S4200 series and your physical security, please read carefully the following installation guide. 2.1.1 Environmental Requirements  The switch must be installed in a clean area. Otherwise, the switch may be damaged by electrostatic adherence.
  • Page 11 S4200 Installation Guide Chapter 2 Hardware Installation avoid harmful gases, such as SO S, NO , NH and Cl , etc. The table below details the threshold value. Average (mg/m³ ) Max (mg/m³ ) 0.006 0.03 0.04 0.15 0.05 0.15 0.01 Table 2-2 Environmental Requirements: Particles 2.1.1.2 Temperature and Humidity...
  • Page 12 S4200 Installation Guide Chapter 2 Hardware Installation It is adopted module switch power for the switch, the input parameters of power are shown below: The AC input voltage: 90~300VAC The frequency: 47Hz ~ 63Hz The DC input voltage: 12V/3.3A Before powering on the power supply, please check the input power to ensure proper grounding of the power supply system.
  • Page 13: Installation Notice

    S4200 Installation Guide Chapter 2 Hardware Installation 2.1.1.6 Rack Configuration The dimension of the switch is designed to be mounted on a standard 19’’ rack. Please ensure good ventilation for the rack.  Every device in the rack will generate heat during operation, therefore vent and fans must be provided for an enclosed rack, and devices should not be stacked closely.
  • Page 14: Installation Preparation

    S4200 Installation Guide Chapter 2 Hardware Installation  Do not touch the power plug and power socket.  Do not place the tinder near the switch.  Do not configure the switch alone in a dangerous situation.  Use standard power sockets which have overload and leakage protection. ...
  • Page 15: Installation Guide

    S4200 Installation Guide Chapter 2 Hardware Installation  Cross screwdrivers  Flat-blade screwdriver  ESD wrist strap  Antistatic uniform Caution! Users should prepare the required tools by themselves. 2.3 Installation Guide 2.3.1 Installing the Switch Please mount the switch as below: 1.
  • Page 16: Connecting Console

    S4200 Installation Guide Chapter 2 Hardware Installation 2.3.2 Connecting Console S4200 series provide a RJ45 serial console port. Fig 2-3 Connecting Console to switch The connection procedure is listed below: Find the console cable provided in the accessory kit. Attach the RJ45 end to console port of the switch.
  • Page 17: Power Supply Connection

    Do not stare at the fiber bore when the switch is in operation. That may hurt your eyes. 2.3.5 Power Supply Connection S4200 series use the power is 220VAC. Please read the power input specification for the detailed information. Power supply connection procedure is described as below:...
  • Page 18 2. Check the power status indicator in the front panel of the switch. The corresponding power indicator should light. S4200 series is self-adjustable for the input voltage. As soon as the input voltage is in the range printed on the switch surface, the switch can operate correctly.

This manual is also suitable for:

S4200-10p-siS4200-10p-pl-siS4200-28p-siS4200-28p-pl-si

Table of Contents