Fireplaces equipped with a water boiler must be pressure-tested after hydraulic connection to the heating system. Masonry work may follow only after this pressure test. Ulrich Brunner GmbH does not cover any costs incurred by necessary dismantling of masonry for rework at water boiler installation or replacement of the boiler.
If additional parts are installed on the fireplace which are not approved for this appliance by Ulrich Brunner GmbH (for example, an external control unit), it is a customized product that meets cus- tomer requirements. The resulting fireplace insert is not type-tested; the declaration of performance of this fireplace insert will be no longer valid.
Combustion air ducts Stoves and fireplaces with BRUNNER heating inserts are classified by law as indoor air-dependent fire- places. The combustion air can be supplied from outside via a sufficiently dimensioned pipework. This for BRUN- NER heating inserts are fitted with a combustion air connection piece. To avoid draughts in the room, the out- side air connection should be routed to this combustion air connection piece.
ASSEMBLY OF AN HKD SK The HKD SK must be set onto a support frame or a suitable support- ing construction of a different kind. Combustion chamber (fireclay lin- ings and protecting hood or smoke deflector) and front kit must be as- sembled on-site.
Page 30
Dimension sheets - HKD 2.2 SK with cleaning mechanism Design characteristics for adjacent storage mass We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col-...
Page 31
Planning and installation - HKD 2.2 SK with cleaning mechanism Tested according to EN 13229 W EN 13229 W Values measured at Rated power Practical avg. Data for functional demonstration Rated heat power Fire wood volume kg/h Combustion performance 13.5 Flue gas mass flow Outlet temperature (before reheating surface) °C...
Page 33
1/2“ for sensor int.th. … round Design characteristics for adjacent storage mass We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col- Stand: 2023-11-07...
Page 34
Planning and installation - HKD 2.2 SK Tunnel with cleaning mechanism Tested according to EN 13229 W EN 13229 W Values measured at Rated power Practical avg. Data for functional demonstration Rated heat power Fire wood volume kg/h Combustion performance 13.5 Flue gas mass flow Outlet temperature (before reheating surface)
Page 37
1/2“ for sensor int.th. … round with door frame We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col- Stand: 2023-11-07...
Page 38
Planning and installation - HKD 2.2k-SK Tested according to EN 13229 W EN 13229 W Values measured at Rated power Practical avg. Data for functional demonstration Rated heat power Fire wood volume kg/h Combustion performance Flue gas mass flow Flue gas temperature after: boiler °C Necessary supply pressure...
Page 39
1/2“ for sensor int.th. … with cast iron frame We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col- Stand: 2023-11-07...
Page 40
Planning and installation - HKD 2.6k-SK Tested according to EN 13229 W EN 13229 W Values measured at Rated power Practical avg. Data for functional demonstration Rated heat power Fire wood volume kg/h Combustion performance Flue gas mass flow Flue gas temperature after: boiler °C Necessary supply pressure...
Page 43
Dimension sheets - HKD 2.2 XL-SK/h Design characteristics for adjacent storage mass We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col-...
Page 44
Planning and installation - HKD 2.2 XL-SK/h Tested according to EN 13229 W EN 13229 W Values measured at Practical avg. Suitable for all construction types according to rules Data for functional demonstration Rated heat power Fire wood volume kg/h Combustion performance Flue gas mass flow 13.5...
Page 46
… round with door frame Design characteristics for adjacent storage mass We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col- Stand: 2023-11-07...
Page 47
Planning and installation - HKD 2.2 XL-SK/h Tunnel Tested according to EN 13229 W EN 13229 W Values measured at Rated power Practical avg. Data for functional demonstration Rated heat power Fire wood volume kg/h Combustion performance Flue gas mass flow 13.5 Outlet temperature (before reheating surface) °C...
Need help?
Do you have a question about the HKD SK and is the answer not in the manual?
Questions and answers