Download Print this page

Brunner 200017 Instructions For Use Manual

Water boilers for tiled stoves

Advertisement

Quick Links

for Use
Instructions
Water boilers
for tiled stoves
©2020

Advertisement

loading
Need help?

Need help?

Do you have a question about the 200017 and is the answer not in the manual?

Questions and answers

Summary of Contents for Brunner 200017

  • Page 1 for Use Instructions Water boilers for tiled stoves ©2020...
  • Page 2 The stove cannot be used under any circumstances, when the water boiler is not functional - even if the chosen operation mode will exclude hot water applications! During operation please remember about the following: Instructions for Use (1.23) © 2020 Brunner GmbH...
  • Page 3: Initial Operation

    - Rated heating power can be achieved only, if the water boiler is operated at full load. At partial load the water heating power is disproportionally low, direct heat projection into the room is significantly higher! © 2020 Brunner GmbH Instructions for Use (1.23)
  • Page 4: Preliminary Notes

    The flue gas must be led away into the chimney on shortest possible way. Instructions for Use (1.23) © 2020 Brunner GmbH...
  • Page 5 In this case, the reheat- ing surface is operated via the previously described three-way flap. Keep these operating instructions concerning the heating system visible, well placed in the installation room. © 2020 Brunner GmbH Instructions for Use (1.23)
  • Page 6: Cleaning And Maintenance

    (see marked with er- rors in the picture). Soot is falling down into the combustion chamber. Put the deflecting block(-s) back in place. Instructions for Use (1.23) © 2020 Brunner GmbH...
  • Page 7 (see marked with er- rors in the picture). Soot is falling down into the combustion chamber. Put the deflecting block(-s) back in place. © 2020 Brunner GmbH Instructions for Use (1.23)
  • Page 8 Soot is falling down into the combustion chamber. Put the deflecting block(-s) back in place. Kompakt-Kessel B4N Illustr. 1: B4 with cleaning spring Illustr. 2: B4 without cleaning spring Instructions for Use (1.23) © 2020 Brunner GmbH...
  • Page 9 The deposits must be removed from time to time from the deflecting blocks (3). For this purpose, the de- flections can be shortly removed / tilted and placed back in the original position. © 2020 Brunner GmbH Instructions for Use (1.23)
  • Page 10 These deflecting blocks must be removed from time to time, just to let the ashes fall down into the combustion chamber. Put the deflecting blocks back in the original position. On top mount boiler Illustr. 3: laterally section Illustr. 4: cross section Instructions for Use (1.23) © 2020 Brunner GmbH...
  • Page 11 (see marked with errors in the picture). Soot is falling down into the combustion chamber. Put the deflecting block(-s) back in place. © 2020 Brunner GmbH Instructions for Use (1.23)
  • Page 12: Notice

    D-84307 Eggenfelden Reprinting and reproduction, even in part, only with the express permission of the publisher. Tel.: +49 (0) 8721/771-0 / Fax: +49 (0) 8721/771-100 Email: info@brunner.de Art. No.: 200017 Instructions for Use (1.23) © 2020 Brunner GmbH...