PTP-H100 User Manual Table of Contents 1. General Introduction .......................... 2 1.1 Introduction ..............................2 1.2 Features ................................ 4 1.3 Specifications ..............................5 2. Operation ............................... 6 2.1 Before Use (To fill the reservoir) ........................6 2.2 Connect to Test Ports ............................ 6 2.3.
1. General Introduction 1.1 Introduction PTP-H100 hydraulic (Oil & Water) high pressure calibration test pump is a hand operated pressure pump designed to generate and control to 100 MPa (15,000 psi). This pump incorporates a large reservoir (475 cc) and a dual-piston system which is ideal for filling large volume workload with the hand pump and providing smooth increase and decrease of pressure with the fine adjustment for high pressure calibration and test.
Page 4
PTP-H100 User Manual CAUTION Prevent electrical shock, fire or injury and safely operate and maintain the product 1) Read below safety information before using the product. 2) Assemble and operate the high-pressure system only if you are familiar with the correct safety procedures.
PTP-H100 User Manual 1.2 Features ③ Test ports 2ea ② Priming pump handle ⑤ Vent/release valve ⑧ Handle bar ⑦ Reservoir cap (Included safety valve) ④ Priming pump Isolation valve ⑨ Drain plug ① Reservoir ⑥ Fine pressure adjustment Item Description ①...
PTP-H100 User Manual 1.3 Specifications 0 ~ 100 MPa (15,000 psi), Lever type hand pump Priming pump Dual piston cylinder system Pressure 4 cc / stroke generation VAC ~ 100 MPa (15,000 psi), Volume Adjustable, Fine controls & control Fine controls piston volume 1.3 ml...
CCW as shown in the following picture. * Check the O-Ring on the bottom of the test port before install. For pressure gauges of different sizes and thread, use PDK's Hand-tight adapter. (CA-H Series) Various adapters as an optional item - Adaptors 1 (optional): 1/8", 1/4", 3/8", 1/2"...
PTP-H100 User Manual 2.3 Zero the product 2.3.1 Turn vent/release valve and priming pump isolation valve, CCW until the valve is fully open then wait over 5 seconds. 2.3.2 Turn fine pressure adjustment wheel, to the middle position. 2.3.3 Read the zero pressure after set zero from reference gauge and UUT.
2.7.1 Remove the drain plug to drain the contaminated media. Tilt the PTP-H100 then open the drain plug to drain out the contaminated media to a container. At this time, a container of more than 1 liter is used because nearly 500 cc of media may come out.
(Contact PDK or local distributor) Difficult to maintain pressure (leakage) Fine adjustment O-ring is worn Replace the O-ring (Contact PDK or local distributor) Test port O-Ring is worn Replace the O-ring Reservoir cap has safety valve and a strong impact may cause a slight leakage of the media.
① Open Priming pump isolation valve ④ It can be closed when for precision measurement Fine pressure adjustment ⑤ Fine adjust PDK CO., LTD. SERVICE CENTER Company Address Contacts (Postal Code. 34122) 10-6, Tel. 042-862-6880 PDK CO., LTD. Expo-ro 339beon-gil, Fax.
Need help?
Do you have a question about the PTP-H100 and is the answer not in the manual?
Questions and answers