aiko Neostar 2S Installation Manual

aiko Neostar 2S Installation Manual

Mono glass module

Advertisement

A
IKO PV Module Installation Manual
Mono Glass Module
AIKO Energy reserves the right to change this Manual without prior notice
Please check the latest version of the Installation Manual in the official website of AIKO Energy
Website: https://aikosolar.com/
Mono glass Modules Installation Manual, version 1.1, January 2024
1 / 28

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Neostar 2S and is the answer not in the manual?

Questions and answers

Robert Roebuck
February 13, 2025

I'm planning an array and can I ask whether you should allow a gap between each panel?

Subscribe to Our Youtube Channel

Summary of Contents for aiko Neostar 2S

  • Page 1 Mono Glass Module AIKO Energy reserves the right to change this Manual without prior notice Please check the latest version of the Installation Manual in the official website of AIKO Energy Website: https://aikosolar.com/ Mono glass Modules Installation Manual, version 1.1, January 2024...
  • Page 2 PV power modules (hereinafter referred to as “modules”)produced by AIKO Energy Technology Co., Ltd. (hereinafter referred to as “AIKO”). Installation and day to day maintenance of modules shall be in accordance with all safety precautions specified in this Manual and local laws.
  • Page 3: Table Of Contents

    ONTENTS 01 OVERVIEW .................................. 5 02 LAWS AND ACTS ................................5 03 GENERAL INFORMATION ............................. 6 3.1M ............................6 ODULE IDENTIFICATION 3.3 G ..............................9 ENERAL SAFETY 3.4 E ............................. 9 LECTRICAL SAFETY 3.5 H ............................10 ANDLING SAFETY 3.6 F ..............................
  • Page 4 09 MAINTENANCE OF PV MODULES ..........................26 9.1 C ............................... 26 LEANING 9.2 V ........................27 ISUAL CHECKS OF THE MODULES 9.3 C ........................28 HECKS OF CONNECTORS AND CABLES 9.4 AIKO T ..........................28 ECHNICAL UPPORT 4 / 28...
  • Page 5: Overview

    01 Overview Thank you very much for choosing the products of AIKO Energy Technology Co., Ltd. (hereinafter referred to as “AIKO”). This Installation Manual contains important information regarding electrical and mechanical installation which you shall know before installing modules. It also contains some other safety information that you must be familiar with.
  • Page 6: General Information

    03 General information 3.1Module identification AlKO modules provide Two visual labels: Nameplate Product type, information regarding the rated power, rated current, rated voltage, open circuit voltage, short circuit current under standard test conditions (STC), maximum system voltage and certification mark, etc. Serial number Each individual module is identified with a unique serial number which is printed on the barcode and placed into the module before lamination.
  • Page 7 Barcode Packing List:Packing list including the information of the module type, product serial number, package weight, package dimension as well as cells color classification. To ensure consistency of the overall color of system when the customer use the modules, the box of modules is packaged according to the same color of cells and marking the with S1, S2, S3, on the packing list.
  • Page 8 3.2 Wiring method The junction box of AlKO modules is located in the middle position. Please refer to the table below for how to connect AlKO modules in series. 8 / 28...
  • Page 9: General Safety

    AlKO modules are designed to operate in application according to IEC standards IEC-61215 and IEC- 61730. Modules are designed with safety class ll and fire class rating C. ⚫ Before to handle and install AIKO PV module, read carefully and understand this Installation Manual. If you need any explanation, contact AIKO (aikosolar.com). ⚫...
  • Page 10: Handling Safety

    ⚫ Do not make electrical connection by means other than connectors. ⚫ Broken modules have the risk of electric shock and fire that must be replaced immediately. ⚫ Module must be installed when it is electrically safe. ⚫ Avoid touching modules as the surface and frame of the modules may be hot and there is a risk of burns or electric shock.
  • Page 11: Fire Safety

    ⚫ During the transportation, please refers to Chapter 4 - Storage and Transportation instructions. Any inappropriate handling and storage can result in breakage of glass or loss of electrical property, and consequently loss the use value of modules. ⚫ Take careful when install the modules. In any case, it is forbidden to lift the module by lifting the junction box or cable.
  • Page 12: Storage And Transportation Instructions

    Upon arrival of the modules, please check the packaging box is in good condition, and check whether the module type and quantity on the outer packaging are consistent with the delivery order. If anything wrong is observed, please contact AIKO logistics and sales staff immediately. ⚫...
  • Page 13: Considerations For Module Turnover And Transportation

    4.2 Considerations for module turnover and transportation ⚫ When using forklift to transport modules, please ensure that the fork length meets the requirements to avoid module tilting due to uneven force. ⚫ When opening the packing box, please place the modules to be unpacked at a distance of 20-30cm from the wall or another torr of modules, and then remove the torr.
  • Page 14: Installation Conditions

    05 Installation conditions 5.1 Location and working environment ⚫ Modules are recommended to be installed in a -20℃ to 50℃ environments, with an extreme working ambient temperature of -40 ℃ to 85 ℃ and a humidity less than 85%RH. ⚫ Modules are designed to operate below 2000 m (above sea level).
  • Page 15: Tilt Angle Selection

    When the surface of the module is perpendicular to sunlight, the output power reach the maximum output value. AIKO recommend the installation angle shall not less than 10 degree. The optimal tilt angle of PV arrays shall be designed by taking into account the multi-year average monthly irradiance, direct irradiance, scattering irradiance, wind speed and other climate conditions at the location.
  • Page 16: Mechanical Installation

    06 Mechanical installation 6.1 General requirements ⚫ Make sure that the modules are properly installed and the mounting structure are adequately fastened. Module mounting system shall be constructed of anticorrosive, ultraviolet resistant materials. ⚫ Installation bracket system shall be tested and inspected by the third party testing institution with static mechanical analysis capacity in accordance with local national standards or international standards.
  • Page 17: Mounting Pressure Clamps

    Other mounting configurations may be used provided that consultation is made with, and prior written consent is received from, AIKO Energy. Failure to do so will invalidate our warranty. 6.2.1 Mounting pressure clamps Specialized pressure clamps are used to mount modules as shown below.
  • Page 18: Mono Glass Modules Clamp Mounting Diagram And Corresponding Loads

    Distance and length are provided in mm; pressure is provided in Pa. Installation Range D Module Size Installation Method Module Model Load L*W(mm) 30mm Frame 33mm Frame AIKO-A***-MAH54Mw 1757*1134 +5400/-2400 310≤D≤410 AIKO-A***-MAH54Mb Clamp mounting on long frame AIKO-A***-MAH72Mw 2323*1134 +5400/-2400 470≤D≤520...
  • Page 19: Bolts Mounting

    Kommentiert [1]: 建议把 D 的范围用如下形式来标注 Installation Range D Installation Method Module Model Module Size L*W(mm) Load 30mm Frame Clamp mounting on AIKO-A***-MAH54Mw 1757*1134 +1600/-1600 100≤D≤240 long frame AIKO-A***-MAH54Mb Note: The above data is based on the static load requirements of IEC61215 standard.
  • Page 20 It is important to ensure the bolts do not fail due to deformation or corrosion during the overall load of the module. AIKO recommend the thickness of washer should ≥1.7mm and use M8 nut and bolt, the tightening torque should be between 16-20 Nm depending on the bolt grade.
  • Page 21: Mono Glass Modules Bolt Mounting Diagram And Corresponding Loads

    (the beam perpendicular to the long frame) Load [Pa] Module size 400mm 1100mm 1400mm Module Model L*W*H(mm) mounting holes mounting holes mounting holes AIKO-A***-MAH54Mw 1757*1134*30/35/40 +5400/-2400 +5400/-2400 AIKO-A***-MAH54Mb AIKO-A***-MAH72Mw 2323*1134*30/33 +2400/-2400 +5400/-2400 Note: The above data is based on the static load requirements of IEC61215 standard.
  • Page 22: Single-Axis Tracking System Installation

    6.2.5 Single-axis tracking system installation AIKO 72 type modules come standard with four mounting holes matching M6 bolts (As shown inthe circle is marked in the figure below); Used for matching Tracking system product such as NEXTracker. Using bolt to install the module on the bracket through the mounting hole at the back of the module’s frame.
  • Page 23: Electrical Installation

    (STC) for PV modules: irradiance 1,000 W/m²; cell temperature 25 ℃; AM1.5. The maximum system voltage of AIKO modules is 1,500 V. When modules are in series connection, the string voltage is sum of every individual module in one string. When modules are in parallel connection, the current is sum of the individual modules as shown below.
  • Page 24: Cables And Connections

    AIKO recommend use copper cables with a minimum cross sectional area of 4 mm² which are rated for 90 ℃ and are UV resistant shall be used as PV connecting lines. The minimum bending radius of the cable is 43mm.
  • Page 25: Connector

    Third-party grounding devices meeting local electrical installation standards at the location may be used for grounding AIKO Energy modules. Grounding device shall be installed according to the operation manual provided by the manufacturer.
  • Page 26: Maintenance Of Pv Modules

    Modules shall be inspected and maintained on a regular basis, especially within the warranty period, which is an obligatory responsibility of the user. Any damage or other visible abnormalities of the module shall be reported to AIKO Energy customer service upon discovery. 9.1 Cleaning...
  • Page 27: Visual Checks Of The Modules

    The weight of the cleaning robot should not be more than 40kg, the component damage and power attenuation caused by improper cleaning with the cleaning robot are not covered by the warranty of AIKO Energy. 9.2 Visual checks of the modules...
  • Page 28: Checks Of Connectors And Cables

    Whether the connectors are properly sealed and the cables are properly fastened, ⚫ Whether the sealant of the junction box is cracked. 9.4 AIKO Technical Support In order to request Technical Support: ⚫ Collect evidences of the issue as (a) photos and (b) measurements.

This manual is also suitable for:

Aiko-a455-mah54mbNeostar 2s+

Table of Contents

Save PDF