ZOE C215L-A-EU Quick Installation Manual

All-in-one outdoor energy storage cabinet

Advertisement

Quick Links

All-in-One
Outdoor Energy Storage Cabinet
Quick Installation Guide
Model: C215L-A-EU

Advertisement

loading

Summary of Contents for ZOE C215L-A-EU

  • Page 1 All-in-One Outdoor Energy Storage Cabinet Quick Installation Guide Model: C215L-A-EU...
  • Page 2: Table Of Contents

    Table of Contents 1. Product features 1. Product features 2. Tools 3. Safety Cautions 4. Location Selection 5. Foundation Requirement 6 - 7 6. Transportation Requirement 7. Cabinet Reinforcement 8. Electrical Connection Requirement 9. Communication Connection Requirement 10. Other Requirements Weight 2450±50kg Size...
  • Page 3: Tools

    2. Tools 3. Safety Cautions (1) It is required to observe safety management regulations of the construction site upon entry. S.N. Name Purpose Picture (2) To enter the construction site, one shall wear a sturdy safety helmet properly (with the strap well fastened), and Cable stripping knife For stripping the electrical insulation of cable avoid loose clothes and slippers.
  • Page 4: Location Selection

    4. Location Selection 5. Foundation Requirement As shown in the figure As shown in the figure · The floor shall be flat with 1499*1444 leveled area; four M12*30 anchor bolts shall be driven into the ground for installation of the cabinet ·...
  • Page 5: Transportation Requirement

    6. Transportation Requirement Lifting and lowering the cabinet As shown in the figure As shown in the figure · The lifting rope shall go through the four rings; the lifting height shall reach 800mm; in this way, the included angle ·...
  • Page 6: Cabinet Reinforcement

    7. Cabinet Reinforcement 9. Communication Connection Requirement As shown in the figure · After the cabinet is located onto the anchor bolts, it shall be locked tight by using M12 nuts, spring washers and flat washers As shown in the figure 8.
  • Page 7 ENERGY FOR LIFE...