Tayplay Active 2000 Installation Instructions Manual

Advertisement

Quick Links

2.0m Active 2000
Installation Instructions
Using Loose Fill Safety Surface
Product Overview
The Active 2000 Activity Net has been designed to be used by children from 3
years
of
age
and
Standard EN1176-1(2008) and EN1176-11(2014).
The following installation instructions should be adhered to in order that the
equipment functions in a safe manner.
Contents
Maintenance & Contact
Details
has
been
manufactured
Page 2
Page 2
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
to
exceed
the
European
Special Points of interest
Polished stainless steel mast with
solid aluminium dome.
18mm diameter Nylon braided rope
with steel re-enforcement.
Galvanised foundation steelwork.
Netform 'HD' aluminium rope
connecting system.
Low Maintenance
Product Act2000-1 Produced by Tayplay Ltd
Playground

Advertisement

loading

Summary of Contents for Tayplay Active 2000

  • Page 1: Table Of Contents

    2.0m Active 2000 Installation Instructions Using Loose Fill Safety Surface Product Overview The Active 2000 Activity Net has been designed to be used by children from 3 years been manufactured exceed European Playground Standard EN1176-1(2008) and EN1176-11(2014). The following installation instructions should be adhered to in order that the equipment functions in a safe manner.
  • Page 2: Space Requirements

    Installation instructions The Active 2000 Activity Net is delivered in three sections. Section One is the polished stainless stell mast which is to be mounted over the central spigot of the foundation steelwork leaving the top of the mast to accept the aluminium dome.
  • Page 3: Foundation Requirements

    The use of a datum peg (point (b)) is recommended in order to easily relocate the exact foundation position (both horizontally and vertically) which was originally established during setting out. Product Act2000-1 Produced by Tayplay Ltd...
  • Page 4: Foundation Setting

    Product Page Four Act2000-1 2341 All dimensions are taken to the centre of the anchor DETAIL A SCALE 1 : 10 Product Act2000-1 Produced by Tayplay Ltd...
  • Page 5: Excavation & Positioning

    Use bolted temporary timber supports to suspend and secure the anchor during concreting. Note: To easily remove the support timbers following concreting, secure the timbers by bolting from the underside of the spigots top plate. Product Act2000-1 Produced by Tayplay Ltd...
  • Page 6: Assembly Instructions

    See 1:1 and 1:2. (1.4)Push the aluminium dome into the top of the mast. Stage Two The Active 2000 activity net is now ready to be attached to the foundations. (2.1) Lift the net and mast vertically and place of the central mast spigot.
  • Page 7 For further information and technical assistance regarding the cone climber range, please contact the original manufacturers at: Tayplay Ltd 13A Riverview Business Park Friarton Road Tel: ++44(0)1738 449 084 Perth Fax: ++44(0)1738 449 094 PH2 8DF email: info@tayplay.com Scotland Web: www.tayplay.com Product Act2000-1 Produced by Tayplay Ltd...