Download Print this page

Tayplay Twin Active 4000 Installation Instructions Manual

Advertisement

Quick Links

4.0m Twin Active 4000
Installation Instructions
Rubber Safety Surface
Product Overview
The Twin Active 4000 Activity Net has been designed to be used by children
from 5 years of age and has been manufactured to exceed the European
Playground Standard BS-EN 1176-1(2008).
The following installation instructions should be adhered to in order that
the equipment functions in a safe manner.
Contents
Special Points of interest
Page 2
Polished stainless steel mast with
solid aluminium dome.
Page 2
18mm diameter Nylon braided rope
Page 2
with steel re-enforcement.
Page 3
Galvanised foundation steelwork.
Page 4
Netform 'HD' aluminium rope
connecting system.
Page 5
Low Maintenance
Page 6
Page 8
Product TwinAct4000-R1 Produced by Tayplay Ltd

Advertisement

loading

Summary of Contents for Tayplay Twin Active 4000

  • Page 1: Table Of Contents

    Installation Instructions Rubber Safety Surface Product Overview The Twin Active 4000 Activity Net has been designed to be used by children from 5 years of age and has been manufactured to exceed the European Playground Standard BS-EN 1176-1(2008). The following installation instructions should be adhered to in order that the equipment functions in a safe manner.
  • Page 2: Space Requirements

    16095x10779 is required. Installation instructions The Twin Active 4000 Activity Net is delivered in three sections. Section One is the polished stainless steel masts which is to be mounted over the central spigots of the foundation steelwork leaving the top of the masts to accept the aluminium domes.
  • Page 3: Foundation Requirements

    The use of a datum peg is recommended in order to easily relocate the exact foundation position (both horizontally and vertically) which was originally established during setting out. Product TwinAct4000-R1 Produced by Tayplay Ltd...
  • Page 4: Foundation Setting

    Anchor hole positioned directly above All dimensions to the centre hole at the rear of the box. the front of the concrete block. hole in the anchor. Corner Foundation Hole: 1000x1000x800 Centre Foundation Hole: 800x800x800 Product TwinAct4000-R1 Produced by Tayplay Ltd...
  • Page 5: Excavation & Positioning

    Use bolted temporary timber supports to suspend and secure the anchor during concreting. Note: To easily remove the support timbers following concreting, secure the timbers by bolting from the underside of the spigots top plate. Product TwinAct4000-R1 Produced by Tayplay Ltd...
  • Page 6: Assembly Instructions

    2) Locate the base of the mast over the centre spigot. With the excavator still taking the weight, connect the rigging screws to the four corner anchors. Rigging screws should extend to their maximum length at this stage. Product TwinAct4000-R1 Produced by Tayplay Ltd...
  • Page 7 Do not over tighten the net. 5) Connect the second bow shackle on the loop of wire to the safety anchor. 6) Finally secure the corner boxes with their lids using the security bolts supplied. Product TwinAct4000-R1 Produced by Tayplay Ltd...
  • Page 8: Maintenance & Contact Details

    For further information and technical assistance regarding the cone climber range, please contact the original manufacturers at: Tayplay Ltd Inveralmond Trade Park Ruthvenfield Road Tel: ++44(0)1738 449 084 Perth Fax: ++44(0)1738 449 094 PH1 3TT email: info@tayplay.com Scotland Web: www.tayplay.com Product TwinAct4000-R1 Produced by Tayplay Ltd...