Download Print this page

Tayplay Levitator 4 Installation Instructions Manual

Advertisement

Quick Links

Levitator 4
Installation Instructions
Rubber Surface
Product overview
The Levitator 4 has been designed to be used by children from 3 years
of age, and has been manufactured to exceed the European playground
standards EN1176-1:2008 and EN1176-11:2014.
The following installation instructions should be adhered to in order
that the equipment functions in a safe manner.
Special Points of interest
Fabric Reinforced Rubber Belting
16mm Steel wire reinforced braided
nylon rope
One piece hydraulically pressed
aluminium joints
Legs 15mm Fahr Industries CNC Cut
Plastic Insert
Foundation Stainless Steel Feet
10mm SS Rigging Screw with 6mm
Shortlink Chain
Contents
& safety zones
Product Levitator-4 Produced by Tayplay Ltd
Page 2
Page 2
Page 4
Page 6
Page 8

Advertisement

loading

Summary of Contents for Tayplay Levitator 4

  • Page 1: Table Of Contents

    Installation Instructions Rubber Surface Product overview The Levitator 4 has been designed to be used by children from 3 years of age, and has been manufactured to exceed the European playground standards EN1176-1:2008 and EN1176-11:2014. The following installation instructions should be adhered to in order that the equipment functions in a safe manner.
  • Page 2: Space Requirements

    BS-EN 1176 part 11 section 4.3. And therefore a suitable 7.53 metre, circle, Rubber safety surface as shown above, is needed. See table below for recomended Surface Types and Depths: Product Levitator-4 Produced by Tayplay Ltd...
  • Page 3: Instalation Instructions

    Page Three Levitator-4 Installation instructions The Levitator 4 is delivered in two sections The Reinforced Rubber Centre and Rope Net. The dismantled corner legs & ground chain/rigger with fixings for easy assembly Only section 2. is required at this point so the first piece should be left wrapped and stored safely until the groundwork's have been completed and the concrete been given sufficient time to cure.
  • Page 4: Foundation Procedure

    *A sheet of A252 mesh reinforcement should be exact foundation position. pressed into the top of the fresh concrete, to cover the entire surface ensuring at least 50mm cover. Product Levitator-4 Produced by Tayplay Ltd...
  • Page 5 These will position around the already place ground chain points. Bore 10mm holes, 130mm deep for the feet to be bolted directly ontop of the concrete surface using the Hilti Bolts supplied (See lower right image). Product Levitator-4 Produced by Tayplay Ltd...
  • Page 6: Assembly Instructions

    After assembling the legs and rope structure you can now go around attaching the rigging screws loosely to the bolts on the chain and on the net. now, keep the rigging screws fully unwound. Product Levitator-4 Produced by Tayplay Ltd...
  • Page 7 The rubber will straighten up when your net is wound up. The net will need to be tensioned by fully winding up the rigging screws at a later date. (See maintenance for more) Product Levitator-4 Produced by Tayplay Ltd...
  • Page 8: Maintenance

    Levitator-4 Maintenance & Inspection General The Levitator 4 should be inspected and maintained in accordance with the recommendations as detailed in BS-EN 1176 part 7: Guidance on installation, inspection, maintenance and operation for playground equipment. If any part of the equipment is found to be unsafe during an inspection and that part cannot be repaired or replaced immediately, the equipment unit or part(s) concerned should be secured against use.