Download Print this page

Heathkit SG-8 Assembly And Operation Manual page 15

Signal generator
Hide thumbs Also See for SG-8:

Advertisement

(
' ) Cut the lead opposite the outside foil end of a .02 ud condenser to 3/4" in length.
Connect
this lead to K3 (S).
(4 Connect the other lead to TB3 (S).
(4 see Figure 9 for details of mounting the tun-
ingcontrols.
The pointer should be adjusted
to cover the entire scale when the condenser
is rotated.
A
Install the 12AU7 tube in the 9-pin socket on the sub-chassis.
Figure 10
(4 Install the 6C4 tube in the 7-pin socket on the chassis.
( + Assemble
the handle to the cabinet using two10x24
screws.
(Ay Install the rubber feet on the cabinet as shown in Figure 10.
INSTALL
FEET
AS
SHOWN
(4 Slide the chassis into the cabinet
with the line cord
through
s
the hole in the back of the cabinet.
aa
Page 14

Advertisement

loading