Download Print this page

bathstore Portfolio 630446 Assembly Instructions Manual

Base unit cabinet

Advertisement

Quick Links

Portfolio Range
Base Unit Cabinet Assembly Instructions
Introduction
The following instructions will enable you to complete the assembly
of your new furniture.
Recommendation:
In fitting your furniture to avoid risk of damage we strongly
recommend that you fit all cabinets and worktops first before fitting
any door fronts
This way the doors can stay protected from any fitting tools and
dust that might scratch them.
Hardware Box
Each of the cabinets contains a
Hardware box that contains all of
the fitments you need to complete
the assembly of each unit.
So parts do not get mixed up,
please keep it safe with the unit it
came with.
Cabinet Legs
Leg Base Socket Assembly
Push the Socket of the leg boss into the pre-drilled holes on the underside of the cabinet
Then, with a firm tap of a hammer, tap the dowel to expand the socket, fixing the leg base
For additional security, if required, you can screw the legs to the base using the screws
provided.
Socket
Leg Boss
Leg Fitting & adjustment
Push the leg firmly into the base of the socket
On the threads of the adjustment foot you will find a small tab
Turning the foot so this tab is level with the end of the leg will give
you a starting leg height measurement of 150mm
Simply turn the foot to raise or lower the unit to level it as required
TIP: All units should be level to ensure tops are level and doors and
drawer fronts open and close smoothly.
Bathstore Portfolio Instructions - Issue 3.0
Basin Fascia OR
Drawer Front
Hinge Plate
Door Front
Hinges
Cabinet Legs
Note:
Fit the leg so that this
protruding
part sits underneath the
cabinet side panel
This will give improved
support to heavy worktops
Adjustment Foot
Dowel
Handles
Leg
Tab

Advertisement

loading
Need help?

Need help?

Do you have a question about the Portfolio 630446 and is the answer not in the manual?

Questions and answers

Summary of Contents for bathstore Portfolio 630446

  • Page 1 Simply turn the foot to raise or lower the unit to level it as required TIP: All units should be level to ensure tops are level and doors and drawer fronts open and close smoothly. Bathstore Portfolio Instructions - Issue 3.0...
  • Page 2 The studs have small grips to the rear of the round peg so they grip tightly in place as the shelf is loaded with Bathroom products To remove the shelf studs, remove the shelf first, then slightly lift the stud, to release the grip of the prongs and then pull forwards. Shelf Shelf Stud Alternative Shelf Holes Bathstore Portfolio Instructions - Issue 3.0...
  • Page 3: Door Removal

    "A" Door Removal Hook the hinge onto the front of the hinge plate at position "A" Then Push the spring catch on the end of the hinge arm at "C" to release the hinge. Bathstore Portfolio Instructions - Issue 3.0...
  • Page 4 And fitting handles in the middle of drawer fronts works best. Recommendations: For Portfolio Classic Doors, drill on the centre of the frame (19mm in from the door edge) For all other Portfolio Gloss and Matt 40mm might be more suitable Bathstore Portfolio Instructions - Issue 3.0...
  • Page 5 Note the "hook shape" at "A", this slides into a groove on the top of the brackets. "A" Height Adjustment Screw Screw to tighten Plastic the unit to the wall Cover Adjustable Brackets Plastic Cover Bathstore Portfolio Instructions - Issue 3.0...
  • Page 6 "B" - Turn this screw to adjust the fronts up or down (Useful for levelling) "C" - Should you need to remove the fronts, turn this screw firmly to release the drawer front brackets Bathstore Portfolio Instructions - Issue 3.0...
  • Page 7 It will lock into place automatically Re-fit the Plastic Cover Caps over the fixings TIP: The Caps are handed - so check for L & R markings on the back of them Bathstore Portfolio Instructions - Issue 3.0...
  • Page 8 Plinth Clip Plinth Clip Plinth Bracket Fixing Screws Plinth Bracket Side to side adjustment Lift up the Can be made by moving Plinth and clip the Plinth the plinth Clip onto the cabinet legs Bathstore Portfolio Instructions - Issue 3.0...
  • Page 9: Plan View

    NOTE: pack. Distance from the wall = 58mm PLAN VIEW Corner Hinge Plate Corner Panel Corner Post Worktop Handle Adjacent Unit Base Unit Door Corner Hinge Bathstore Portfolio Instructions - Issue 3.0...
  • Page 10 - for example to show more of the corner panel which can be useful in closing up any gap in a run of units. Bathstore Portfolio Instructions - Issue 3.0...
  • Page 11 Front of Mirror Rear of Mirror Rear of Mirror Hook onto Wall Screw Mirror Mirror Bracket Bracket Wall Screw Teeth of the Bracket hook over the screw head. Bathstore Portfolio Instructions - Issue 3.0...
  • Page 12 Any stubborn marks can be removed with diluted mild detergent e.g. washing up liquid. Mirrors & cabinets. Clean only with a micro fibre cloth, NEVER use “glass and mirror” cleaning products as these can mark the surface Bathstore Portfolio Instructions - Issue 3.0...

This manual is also suitable for:

Portfolio 630443