FAFCO Connected Tube CT Series Installation Manual page 24

Solar pool heating system
Table of Contents

Advertisement

Body
6
Straps
End Caps:
4
Winter: Removed
Summer: Installed
2 Automation:
Winter: "OFF"
Summer: "ON"
1
PHASE IV: Routine Maintenance
5
Winter: Removed
Summer: Installed
4-12" Above Lower Header
Figure 13| Solar System Maintenance
Figure 13 depicts the components to decommission, remove or reinstall during sys-
tem Winterization, Summerization or when performing other routine maintenance.
VRV:
3
Drain Valves:
Winter: "Open"
Summer: "Closed"
7
Isolation Valves:
Winter: "OFF"
Summer: "ON"
®
24

Advertisement

Table of Contents
loading

Related Products for FAFCO Connected Tube CT Series

Table of Contents