Download Print this page

Paradyne 7975 Installation Instructions

Ferrite choke
Hide thumbs Also See for 7975:

Advertisement

Ferrite Choke
Installation Instructions
Document Number 7975-A2-GZ40-00
July 1998
Overview
Installation
Copyright
1998 Paradyne Corporation
7975-A2-GZ40-00
TM
This document describes the procedure for installing a ferrite choke onto the DTE
cable of the Hotwire Model 7975 M/SDSL standalone termination unit.
CAUTION:
All ferrite chokes that are supplied must be installed following these
instructions to ensure compliance with FCC Part 15, VCCI, and
CISPR22 rules.
Procedure
To install the ferrite choke onto the DTE cable:
1. Open the ferrite choke and place it around the cable as close to the cable
connector as possible.
2. Close the two halves around the cable and snap the choke shut, pressing
down on the plastic latch to secure it in place.
3. Add a tie wrap (not included) as shown to prevent the ferrite choke from
slipping down the cable.
Ferrite Choke
Connector
End
Tie
Wrap
Plastic
Latch
97-14820-02
July 1998
1

Advertisement

loading