Teac TASCAM DA-P20 Service Manual page 77

Digital audio tape deck
Table of Contents

Advertisement

Disassembled part
Procedure for disassembly
Cylinder assembly
Remove three screws
and
remove the cyliner.
Remove three screws
and
remove the capstan motor.
Capstan motor
Pin roller assembly
Remove the P roller Or G5.
'Remove the washer (72 , , and
a
the pinch roller assembly
Tension arm
assembly
Remove the spring
.
Remove the screw @6).
Remove the washer 69
remove the tension arm
assembly.
and
Remove the screw 68, and
remove the P, guide assembly.
P, guide assembly
Remove the E-clip (78) and
remove the IC base assemblies
L and R.
IC Base assembly
IC Base assembly
Remove the washers G2. and
(2), , remove the rollers (71) and
61), then remove the camplate
assembly.
Remove the spring
and
washer 68), and remove the
release lever 8).
Remove the E-clip
64),.
Remove the slides F/R 69.
Remove the lock spring 69.
Remove the SP metal 67.
Cam plate assembly
Remoe the TG-L spring L 62.
Remove LODG spring L ed and
LODG spring R 68).
Remove the E-rings
>» Plate SPG (1)
plate SPG (2) 69).
Remove E-clips 64), and @4),,
remove the two rollers
and |
oi plate supporters
and
66) Side plate supporter
, and
and
* Use care not to scratch the
cylinder.
* When installing the cylinder
assembly, keep the tightening
torque less than 1 kg cm.
* When installing the capstan
motor, keep the tightening
torque less than 1 kg-cm.
* Use care not to scratch the
contact surface of the roller
with the tape.
* Use care not to scratch the
tension band.
¢ Use care not to stain the
tension band felt with grease.
« Use care not to scratch the
post.
« Use care not to distort the
tension arm assembly.
©
» Use care not to scratch the -
contact surface ofthe post
tape with the roller.
+ Use care not to scratch the
contact surface of the post
tape with the roller.
¢ Use care not to deform the
spring:
73

Advertisement

Table of Contents
loading

Table of Contents