Download Print this page

ABB ACS580-01 Series Quick Installation Manual page 2

Hide thumbs Also See for ACS580-01 Series:

Advertisement

2
ACS580-01..., ACH580-01... and ACQ580-01...+C135 frames R1 to R3 flange mounting kit quick installation guide
8
Frame R3:
2 × M4 nut 1.5 N·m
j
10
Frames R1...R2:
2 x M6 nuts
Frames R3:
3 x M6 nuts
6 N·m
Back
Front
Back
h
Note: UL Type 12
is fulfilled on the
drive backside
when the flange
and hood are
Back
installed.
Step10 is not
required for IP55.
For dimensions, see the mounting template delivered with the flange
mounting kit or ACS580-01..., ACH580-01... and ACQ580-01...+C135 drives
with flange mounting kit supplement (3AXD50000349821 [English]).
Go to
www.abb.com/drives
ACS580-01 manuals
ACH580-01 manuals
Frames R1...R2:
2 × M4 nut 1.5 N·m
2 × M4 × 8 Combi screw 1.5 N·m
k
j
11
Front
ACQ580-01 manuals
Optional steps
Note: Frame R3 is shown as an example.
The cable shelf varies in different frame sizes.
Note: Reinstall the screws to avoid moisture
exchange through the empty holes!
1.5 N·m
2 × M4 nut
1.5 N·m
12
13
1 × M6×25 screw
1 × M6×25 screw
6 N·m
6 N·m
9
i
Drill holes for M6 Rivet or Kalei nuts. Consider the hole size for the nuts.
Rivet/Kalei nuts are not included in the delivery.
Note: Mounting templates are different (size, number and position of
holes) for different frame sizes.
14
15
R1: 8 × M6×25 screw
R2: 10 × M6×25 screw
R3: 12 × M6×25 screw
6 N·m

Advertisement

loading

This manual is also suitable for:

Ach580-01 seriesAcq580-01 series