Download Print this page

JAB SKYLINE AO 20 Quick Start Manual

Advertisement

Quick Links

Installation on horizontal surface / Mounting on glazing beads [D1]
Take care not to damage the product with a sharp knife when opening!
Screw assembly: Use screwdriver size 2 (POZIDRIVE). Do not use an electric
screwdriver.
WARNING
Young children can be strangled by
loops in pull cords, chains, tapes
and inner cords that operate the
product. To avoid strangulation and
entanglement, keep cords out of
the reach of young children. Cords
may become wrapped around
a child's neck. Move beds, cots
and furniture away from window
covering cords. Do not tie cords
together. Make sure cords do not
twist and create a loop. To reduce
the risk of such accidents, please
install and use the safety appli-
ances enclosed with the delivery
as per our mounting instructions.
Complies with EN 13120.
Mounting of cover caps
1
Mounting of brackets
2
Operation: Detach and move blind
4
B
A
Open
*
Unlock cord lock by pulling the
cord to the middle
Subject to technical changes
The top rail must not be installed below 1.50 m distance
to the floor. Cord wrappers have to be installed as close as
possible to the top rail – in all cases, however, more than
1.50 m distance to the floor.
Mounting
3
A
Lock blind
Stop
Lock cord lock by pulling the cord
outwards
Disassembly of rails: Use a flat screwdriver, size 2.
Please only use the original screws enclosed with the delivery!
Sequence of clipping rail
3-A1
Wichtiger Hinweis (Abstand zwischen Glas und Stoff ):
*
Do not lift the lower rail higher
Stoff e
than the middle rail to avoid a loop
that can cause strangulation.
Blickdichte Stoff e
Abdunkelnde Stoff e
Important notice (clearance between glass and fabric):
Fabrics
Non-transparent fabrics
Dim-out fabrics
AO 20
Width of installation
Number of component parts
0 – 80 cm
2
2
81 – 150 cm
3
3
151 – 220 cm
4
4
221 – 230 cm
5
5
x
x
max. 70 cm
X = 5 cm
3-A2
Disassembly
Senkrecht-
Dachfl ächen-
fenster
fenster
min. 3 mm
min. 10 mm
min. 5 mm
min. 10 mm
B
A
Vertical windows
Skylights
min. 3 mm
min. 10 mm
min. 5 mm
min. 10 mm
2
2
3
2
4
2
5
2
Plafond-
fenster
min. 100 mm
min. 100 mm
C
Ceiling windows
min. 100 mm
min. 100 mm

Advertisement

loading

Summary of Contents for JAB SKYLINE AO 20

  • Page 1 AO 20 Installation on horizontal surface / Mounting on glazing beads [D1] Take care not to damage the product with a sharp knife when opening! Disassembly of rails: Use a flat screwdriver, size 2. Screw assembly: Use screwdriver size 2 (POZIDRIVE). Do not use an electric Please only use the original screws enclosed with the delivery! screwdriver.
  • Page 2 AO 20 Installation on vertical surface / Wall installation [W1] Take care not to damage the product with a sharp knife when opening! Disassembly of rails: Use a flat screwdriver, size 2. Screw assembly: Use screwdriver size 2 (POZIDRIVE). Do not use an electric Please only use the original screws enclosed with the delivery! screwdriver.