Define Instruments G3 IoT Manual page 24

Edge processing interface
Table of Contents

Advertisement

24
C - DIN Rail Mounting
To clip the unit onto the DIN rail:
(1) Hook the upper part of the unit onto the
rail, and then (2) Press down towards the rail
until the red hook clicks into place.
Leave at least 0.79" (2cm) clear on either
side of unit, and at least 1.97" (5cm) above
and below, as space for airflow and wiring.
D - Wiring
Refer to Sections 7–8 in this manual.
E - Removal from DIN Rail
To unclip the unit from the DIN rail, power
the unit down and remove the power
connector.
Then insert a small screwdriver into the slot
on the red hook (just visible when the power
connector is removed), and lever it down.
This will release the hook, allowing the unit
to be detached from the DIN rail.
IMPORTANT!
The supplied Wi-Fi and/or cellular antennas are not suitable for outdoor or wet
environments.
G3 IoT Manual | Doc No: 2303-00000-0-1 | Rev: 24V05 | 19 Mar, 2024
(Fig 3)
(Fig 4)
Fig 3
Fig 4
© 2024 Define Instruments

Advertisement

Table of Contents
loading

Table of Contents