Nozzle; Nozzles Reccomended; Choice Of Nozzles For 1St And 2Nd Stage; Nozzle Assembly - Riello RLS 300/BP MX Installation, Use And Maintenance Instructions

Dual fuel kerosene and gas oil/ gas burners
Hide thumbs Also See for RLS 300/BP MX:
Table of Contents

Advertisement

5.10

Nozzle

The burner complies with the emission requirements of the
EN 267 standard.
In order to guarantee that emissions do not vary, recommended
and/or alternative nozzles specified by Riello in the Instruction
and warning booklet should be used.
It is advisable to replace nozzles every year
during regular maintenance operations.
WARNING
The use of nozzles other than those specified by
Riello S.p.A. and inadequate regular maintenance
may result into emission limits non-conforming to
CAUTION
the values set forth by the regulations in force, and
in extremely serious cases, into potential hazards
to people and objects.
The manufacturing company shall not be liable for
any such damage arising from nonobservance of
the requirements contained in this manual.

5.10.1 Nozzles reccomended

Type HAGO S-S - 60° angle
Type HAGO LC - 60° angle
5.10.2 Choice of nozzles for 1
Both nozzles must be chosen from among those listed in Tab. H.
 The first nozzle determines the delivery of the burner in the
st
1
stage.
 The second nozzle works together with the 1
determine the delivery of the burner in the 2
st
The deliveries of the 1
and 2
the value range indicated on page 8.
Use nozzles with a 60° spray angle at the recom-
mended pressure of 12 bar.
WARNING
As a rule the two nozzles have equal deliveries but the 1
nozzle may have a delivery less than 50% of the total delivery
when a reduction of the counter-pressure peak is desired at the
moment of starting (the burner allows good combustion rates
also with a 33 - 100 % ratio between the 1
Example:
Boiler output = 1630 kW - efficiency 90 %
Output required by the burner = 1630 : 0.9 = 1812 kW;
1812 : 2 = 906 KW per nozzle;
therefore, two equal, 60°, 12 bar nozzles are required:
1° = 18 GPH - 2° = 18 GPH
or the following two different nozzles:
1° = 15 GPH - 2° = 21 GPH

5.10.3 Nozzle assembly

Fit two nozzles with the box spanner 1)(Fig. 12) (16 mm), after
having removed the plastic plugs 2), fitting the spanner through
the central hole in the flame stability disk 3).
Do not use any sealing products such as gaskets,
sealing compound, or tape.
Be careful to avoid damaging the nozzle sealing
WARNING
seat.
The nozzles must be screwed into place tightly but not to the
maximum torque value provided by the wrench.
20036762
st
nd
and 2
stage
st
nozzle to
nd
stage.
nd
stages must be contained within
st
nd
and 2
stage).
Installation
The nozzle for the 1
the firing electrodes Fig. 13.
GPH
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
22.0
24.0
26.0
28.0
30.0
35.0
40.0
45.0
50.0
55.0
60.0
65.0
70.0
st
stage
D11163
18
GB
st
stage of operation is the one lying beneath
kg/h
10 bar
12 bar
14 bar
44.16
48.73
52.96
47.84
52.79
57.38
51.52
56.86
61.79
55.20
60.92
66.20
58.88
64.98
70.62
62.57
69.04
75.03
66.25
73.10
79.44
69.93
77.16
83.86
73.61
81.22
88.27
80.97
89.34
97.10
88.33
97.47
105.93
95.69
105.59
114.75
103.05
113.71
123.58
110.41
121.83
132.41
128.81
142.14
154.48
147.21
162.44
176.54
165.61
182.75
198.61
184.02
203.05
220.68
202.42
223.36
242.75
220.82
243.67
264.82
239.22
263.97
286.88
257.62
284.28
308.95
1
2
3
kW
12 bar
582.36
630.89
679.42
727.95
776.48
825.01
873.54
922.07
970.60
1067.66
1164.72
1261.78
1358.84
1455.90
1698.55
1941.20
2183.85
2426.50
2669.15
2911.80
3154.45
3397.10
Tab. H
2
Fig. 12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rls 400/bp mx2003484420034845

Table of Contents