MPM Wood Plus 18 User Manual

MPM Wood Plus 18 User Manual

Wood gasifying boiler

Advertisement

Quick Links

ORIGINAL INSTRUCTIONS
Boiler user manual - MPM Wood Plus 18 kW
MPM Wood Plus 18 - Wood gasifying boiler.
MPM PROJEKT MARCIN NYKIEL
Boiler manufacturer
Ecological
BIURO@MPM-KOTLY.PL
+48 795 999 555
WWW.MPM-KOTLY.PL
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Wood Plus 18 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for MPM Wood Plus 18

  • Page 1 ORIGINAL INSTRUCTIONS Boiler user manual - MPM Wood Plus 18 kW MPM Wood Plus 18 - Wood gasifying boiler. MPM PROJEKT MARCIN NYKIEL Boiler manufacturer Ecological BIURO@MPM-KOTLY.PL +48 795 999 555 WWW.MPM-KOTLY.PL...
  • Page 2: Table Of Contents

    Statement of conformity ......................................3 Response ECODESIGN ........................................ 4 Response ECODESIGN ........................................ 5 Product Data Sheet in accordance with Commission Regulation (EU) No 2015/1189 ............... 6 Product Data Sheet in accordance with Commission Regulation (EU) No 2015/1187 ............... 6 1. General information ....................................... 7 2.
  • Page 3: Statement Of Conformity

    Statement of conformity...
  • Page 4: Response Ecodesign

    Response ECODESIGN...
  • Page 5: Response Ecodesign

    Response ECODESIGN...
  • Page 6: Product Data Sheet In Accordance With Commission Regulation (Eu) No 2015/1189

    Product Data Sheet in accordance with Commission Regulation (EU) No 2015/1189 Model identifier(s): MPM Wood Plus 18 Stoking mode: Manual: the boiler should be operated with a hot water storage tank of a volume of at least 700 litre Condensing boiler: no...
  • Page 7: General Information

    90°C and the operating pressure is 1.5 bar. The required flue gas draught after the boiler is approx. 0.20 mbar. MPM Wood Plus boilers can be used to prepare domestic hot water with the use of a heat exchanger installed in accordance with the PN-EN 12828:2013-05 standard.
  • Page 8: Fuel

    4. Fuel The fuel for the MPM Wood Plus boilers is firewood (hardwood logs) with a circumference of approximately 20 - 30 cm. The wood recommended by the manufacturer is beech or birch. The wood must be dry and seasoned for at least two years.
  • Page 9: Technical Specifications

    6. Technical specifications Table 2. Technical parameters of the MPM Wood Plus Nominal heat output Boiler class (according to EN 303 -5: 2021-09) efficiency/emissions 5 klasa Energy efficiency class Thermal efficiency Heating surface Boiler height 1050 Housing width Overall width...
  • Page 10: Transport

    Table 3. Basic dimensions of the boiler MPM Wood Plus 1050 1015 1120 Figure 2. Basic dimensions of the boiler MPM Wood Plus 7. Transport The boilers are delivered in an assembled condition on a pallet in foil packaging. It is recommended that the boiler be transported as close as possible to the final installation site in this packaging condition to minimise the possibility of damage to the boiler casing.
  • Page 11: Open Layout

    Boilers of the MPM Wood Plus type can operate in both open and closed systems. An example of how to install the boiler for central heating and hot water in an open system with forced water circulation is shown in Fig. 3. It is recommended to install a thermostatic valve DBV-1 to drain excess energy in case of overheating of the boiler.
  • Page 12: General Requirements For Boiler Rooms

    18. Accumulation tank 8.3. General requirements for boiler rooms The room in which the MPM Wood Plus boiler will be installed must meet the requirements of the standard (e.g. PN- 87/B-02411). The basic conditions must be met, i.e: the boiler should be placed as close as possible to the chimney(s) and the entrance door to the boiler room should •...
  • Page 13: Connecting The Boiler To The Chimney

    8.6. Connection of the boiler to the central heating system An example of the MPM Wood Plus boiler connection scheme is shown in Fig. 3 and 4. The boiler should be connected to the heating system with flanged or threaded connections, installed in an open system (PN-91/B-02413) and the hot water system in accordance with PN-76/B-02440.
  • Page 14: Operation And Use Of The Boiler

    savings of up to 30%. This is linked to the efficiency of the boilers, which generally achieve the highest efficiencies at nominal output. The purpose of the accumulation tank is to store periodic energy surpluses. Water heated in the boiler flows through the accumulation tank, gradually charging the tank.
  • Page 15: Low-Temperature Corrosion

    Open the boiler firing-up door. The filling door, ash pan door and cleanout cover should be tightly closed. Firing-up in the MPM Wood Plus boiler takes place on the ceramic-iron grate, as close as possible to the inlet / window in the metal partition, initially with crushed pieces of paper to heat the chimney and with fine wood.
  • Page 16: Boiler Shutdown

    free and efficient operation of the boiler it is recommended to operate the boiler with nominal output and a temperature on the boiler of at least 65°C. It is also recommended to install a mixing valve. NOTE! If the boiler is operated with a central heating water temperature of less than 60°C, tar precipitation from the burnt fuel intensifies and the boiler exchanger and flue pipe become overgrown with tar deposits, creating the risk of soot ignition in the chimney.
  • Page 17: Seasonal Maintenance

    burner elements. Such cleaning should be done before each time the boiler is fired up. The exchanger channels are cleaned through the boiler top cleanout every 4 to 7 days, depending on the quality of burnt fuel and degree of exchanger fouling.
  • Page 18: Security

    cleanouts with secondary air control, the door and the boiler flue. Protective goggles must be worn. The boiler may only be operated by adults. Under no circumstances should children or persons under eighteen years of age come near the boiler. In order to maintain safe operation of the boiler, the rules must be followed: •...
  • Page 19: Disposal Of The Boiler

    Sealant - sealing cords • Insulating material - vermiculite • Thermometer • Chamotte - Ceramics • Burner • Cast iron grate • Screws • Caps • Hinges • During the guarantee period, the manufacturer shall ensure that the subject of the contract is repaired free of charge within 21 days from the date of notification.
  • Page 20: Warranty Repairs

    Incorrectly executed installation Check the central heating system. Incorrectly matched boiler to building Carry out a summary energy audit of the building Change the position of the flue gas short circuit Short-cycle operation lever Add fuel with a higher calorific value or replace Too low a calorific value of the fuel Excessive fuel with fuel with the required parameters...
  • Page 21: Warranty Card

    WARRANTY CARD In accordance with the conditions stated in the operating instructions, a warranty of 48 months is provided on the tightness of the exchanger (welded connections). Boiler type: Boiler number: Power: Year of production: Packing date: Installation date: Stamp and signature of the manufacturer: Dealer's stamp and signature:...
  • Page 22 MPM PROJEKT MARCIN NYKIEL Roźwienica 147L Boiler manufacturer 37-565 Roźwienica Ecological woj. podkarpackie...

Table of Contents