Advertisement

Quick Links

ORIGINAL INSTRUCTIONS
Boiler user manual - MPM Wood Plus 26 kW
MPM Wood Plus 26 - Wood gasifying boiler.
MPM PROJEKT MARCIN NYKIEL
Boiler manufacturer
Ecological
BIURO@MPM-KOTLY.PL
+48 795 999 555
WWW.MPM-KOTLY.PL
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Wood Plus 26 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for MPM Wood Plus 26

  • Page 1 ORIGINAL INSTRUCTIONS Boiler user manual - MPM Wood Plus 26 kW MPM Wood Plus 26 - Wood gasifying boiler. MPM PROJEKT MARCIN NYKIEL Boiler manufacturer Ecological BIURO@MPM-KOTLY.PL +48 795 999 555 WWW.MPM-KOTLY.PL...
  • Page 2: Table Of Contents

    Statement of conformity ......................................3 Response ECODESIGN ........................................ 4 Response ECODESIGN ........................................ 5 Product Data Sheet in accordance with Commission Regulation (EU) No 2015/1189 ............... 6 Product Data Sheet in accordance with Commission Regulation (EU) No 2015/1187 ............... 6 1. General information ......................................... 7 2.
  • Page 3: Statement Of Conformity

    Statement of conformity...
  • Page 4: Response Ecodesign

    Response ECODESIGN...
  • Page 5: Response Ecodesign

    Response ECODESIGN...
  • Page 6: Product Data Sheet In Accordance With Commission Regulation (Eu) No 2015/1189

    Product Data Sheet in accordance with Commission Regulation (EU) No 2015/1189 Model identifier(s): MPM Wood Plus 26 Stoking mode: Manual: the boiler should be operated with a hot water storage tank of a volume of at least 1000 litre Condensing boiler: no...
  • Page 7: General Information

    90°C and the operating pressure is 1.5 bar. The required flue gas draught after the boiler is approx. 0.30 mbar. MPM Wood Plus boilers can be used to prepare domestic hot water with the use of a heat exchanger installed in accordance with the PN-EN 12828:2013-05 standard.
  • Page 8: Fuel

    4. Fuel The fuel for the MPM Wood Plus boilers is firewood (hardwood logs) with a circumference of approximately 20 cm. The wood recommended by the manufacturer is beech or birch. The wood must be dry and seasoned for at least two years.
  • Page 9: Technical Specifications

    6. Technical specifications Table 2. Technical parameters of the MPM Wood Plus Nominal heat output Boiler class (according to EN 303 -5: 2021-09) efficiency/emissions 5 klasa Energy efficiency class Thermal efficiency 90,1 Heating surface Boiler height 1183 Housing width Overall width...
  • Page 10: Transport

    Table 3. Basic dimensions of the boiler MPM Wood Plus 1183 1220 1000 1100 Figure 2. Basic dimensions of the boiler MPM Wood Plus 7. Transport The boilers are delivered in an assembled condition on a pallet in foil packaging. It is recommended that the boiler be transported as close as possible to the final installation site in this packaging condition to minimise the possibility of damage to the boiler casing.
  • Page 11: Open Layout

    Boilers of the MPM Wood Plus type can operate in both open and closed systems. An example of how to install the boiler for central heating and hot water in an open system with forced water circulation is shown in Fig. 3. It is recommended to install a thermostatic valve DBV-1 to drain excess energy in case of overheating of the boiler.
  • Page 12: General Requirements For Boiler Rooms

    18. Accumulation tank 8.3. General requirements for boiler rooms The room in which the MPM Wood Plus boiler will be installed must meet the requirements of the standard (e.g. PN- 87/B-02411). The basic conditions must be met, i.e: the boiler should be placed as close as possible to the chimney(s) and the entrance door to the boiler room should •...
  • Page 13: Connecting The Boiler To The Chimney

    8.6. Connection of the boiler to the central heating system An example of the MPM Wood Plus boiler connection scheme is shown in Fig. 3 and 4. The boiler should be connected to the heating system with flanged or threaded connections, installed in an open system (PN-91/B-02413) and the hot water system in accordance with PN-76/B-02440.
  • Page 14: Boiler Interaction With An Accumulation Tank

    used. NOTE! To ensure correct boiler operation, the boiler must be protected against corrosion caused by water returning from the central heating system at a temperature below the dew point. The temperature of water returning to the boiler must be at least 55 ºC. The temperature difference of the heating medium between the boiler feed and return should be in the range of 15 - 20 ºC.
  • Page 15 Open the boiler firing-up door. The filling door, ash pan door and cleanout cover should be tightly closed. Firing-up in the MPM Wood Plus boiler takes place on the ceramic-iron grate, as close as possible to the inlet / window in the metal partition, initially with crushed pieces of paper to heat the chimney and with fine wood.
  • Page 16: Low-Temperature Corrosion

    Figure 10: Location of secondary air supply screens Through the flame viewer located in the upper boiler hatch, we can observe the colour of the flame: red - too little secondary air • bright white fire - too much secondary air •...
  • Page 17: Cleaning And Maintenance Of The Boiler

    Figure 11: Primary air volume setting Secondary air Nos. 1 and 2 located on the boiler side exhausts open to the maximum. The secondary air settings are shown in drawing No. 2. The secondary air settings are shown in drawing No. 11. Figure 11: Setting the sendary air volume 11.
  • Page 18: Behaviour In The Event Of A Flue Gas Fire

    • remove the fuel from the firebox into a tin container, taking care not to burn or fume (use short periods of time in the boiler room, open doors or vents where possible). The removal of embers from the firebox should only be carried out with the assistance of another person.
  • Page 19: Mechanical Draught Excluder

    14.2. Mechanical draught excluder Once the boiler has been properly set up in accordance with the guidelines in Chap. 9.2. Commissioning and use of the boiler, the thermal protection of the boiler will also be provided by a mechanical draught meter, which is an essential accessory for the boiler.
  • Page 20: Disposal Of The Boiler

    16. Disposal of the boiler The components used in the manufacture of the boiler are made of materials which change their state of aggregation and chemical activity at temperatures far in excess of those achievable with normal boiler operation. The materials used in the manufacturing of the appliance do not emit harmful substances to the environment and people, even under conditions exceeding those of normal operation of the boiler.
  • Page 21: Warranty Repairs

    No boiler return protection Fit a fixed-temperature valve with a min. 55°C When the boiler is started up at start-up, When starting the boiler, please fire the fuel to Water is leaking so-called "boiler sweating" can occur. This 70-80°C and keep it on the boiler for several from the outlets is a symptom of a temperature difference hours.
  • Page 22: Warranty Card

    WARRANTY CARD In accordance with the conditions stated in the operating instructions, a warranty of 48 months is provided on the tightness of the exchanger (welded connections). Boiler type: Boiler number: Power: Year of production: Packing date: Installation date: Stamp and signature of the manufacturer: Dealer's stamp and signature:...
  • Page 23 MPM PROJEKT MARCIN NYKIEL Roźwienica 147L Boiler manufacturer 37-565 Roźwienica Ecological woj. podkarpackie...

Table of Contents