POWER DISTRIBUTION MANAGER
QUICK START GUIDE
Model Number: TTPDM120S, TTPDM120S-2UP, TTPDM120S-4UP
READ ALL INSTRUCTIONS PRIOR TO USE:
NOTE: Each PDM or stack of connected PDMs require a dedicated 20A branch circuit, see figures
below for explanation. To reduce or eliminate breaker trip do not have additional loads or other
Quickstart TTPDM120S product setup
Plug unit into available 120V/20A outlet as shown below, power cord is included with product. Green status LEDs
will illuminate sequentially when energized indicating unit is ready to use. See detailed instructions further
below in this guide regarding switching and normal operation.
Quickstart setup for connecting multiple PDMs or for TTPDM120S-2UP, TTPDM120S-4UP kits:
Unpack and stack PDMs from your kit as shown in view below. On the LINK UP / LINK DOWN side of the stack,
connect the power patch cords between units as indicated in the figure immediately below.
On the outlet side of the unit connect Powerlink cables as shown below. Lastly connect the 6 ft input cord to
outlet.
Within a couple moments after connected to power, green status LEDs will illuminate sequentially for all
connected units indicating the unit is ready for use.
Towa Industries, Inc / 480 E McGlincy Ln, Campbell CA 95008 / 650.204.0019 / info@towatools.com
outlets on the circuit powering the PDM.
:
PDM Units,
Link up/Link
down side of
units
PowerPATCH
connection
cords
Need help?
Do you have a question about the TTPDM120S-2UP and is the answer not in the manual?
Questions and answers