Toro Titan X5450 Operator's Manual page 19

Hide thumbs Also See for Titan X5450:
Table of Contents

Advertisement

Figure 16
1. Locknut (5/16 inch)
2. Carriage bolt (5/16 x 3/4
inch)
5.
Remove the carriage bolt and locknut on the
side wall of the mower deck securing the left
baffle to the deck
6.
Remove the left baffle from the mower deck
(Figure
16).
7.
Locate the 2 bolts in loose parts and use the
existing locknuts and install these fasteners into
the holes shown in
to prevent flying debris.
Note:
Install the bolt upward, through the
underside of the deck and use an existing
locknut to secure from the topside.
8.
Remove the carriage bolt (5/16 x 3/4 inch) and
locknut (5/16 inch) on the rear wall of the mower
deck securing the baffle to the deck
3. Left baffle
4. Install the fasteners here.
(Figure
16).
Figure 16
on the mower deck
(Figure
g011149
1. Locknuts—front of
discharge plate (install
after removing the baffle)
2. Hex-head bolt—forward
hole in deck (install after
removing the baffle)
3. Locknut—forward hole in
deck (install after removing
the baffle)
4. Carriage bolts—front of
discharge plate (install
after removing the baffle)
9.
Locate the baffle guard at the front edge of the
side discharge opening
10.
Remove the fasteners securing the baffle guard
17).
and the right baffle to the mower deck
17).
Note:
Remove the baffle guard and retain all
fasteners.
11.
Remove the 2 locknuts (5/16 inch) securing the
welded posts of the right baffle to the top of
the mower deck at center and right of center
positions
19
Figure 17
5. Baffle guard—54-inch
decks
6. Locknut (5/16 inch)
7. Carriage bolt (5/16 x 3/4
inch)
(Figure
(Figure
18).
g190737
17).
(Figure

Advertisement

Table of Contents
loading

Table of Contents