Download Print this page

Verkada ACC-POE-90W-E Installation Manual page 5

Outdoor 90w gigabit poe++ injector

Advertisement

Installation
Mounting
Separate the mount plate from
Note
the injector by undoing the screws
with a #2 Phillips head screwdriver
and lifting the injector up.
Insert the included pole straps into
the dual pole strap openings on
the mount plate, at the top and
bottom, in opposing directions.
5
Verkada Inc. 406 E. 3rd Ave, San Mateo, CA 94401
sales@verkada.com
All specifications are subject to change without notice
Copyright © 2024 Verkada Inc. All rights reserved.

Advertisement

loading