Inspection And Maintenance; Preparing The Floor Standing Boiler For Inspection - Bosch Condens 7000 FP Installation And Service Instructions Manual

Floor standing gas condensing boiler
Table of Contents

Advertisement

Inspection and maintenance

11
Inspection and maintenance
NOTICE
Boiler damage through a lack of, or unsatisfactory, cleaning and
inspection or maintenance!
▶ Have the heating system inspected at least once a year, and have any
necessary maintenance or cleaning work carried out.
▶ Clean the boiler at least every 2 years. We recommend annual
cleaning.
▶ Check and clean the condensate pipes and siphon annually.
▶ Carry out any maintenance immediately to avoid any damage to the
system.
▶ Remedy all faults immediately.
Heating systems must be serviced regularly for the following reasons:
• to achieve a high level of efficiency and to operate the heating system
economically (low fuel consumption),
• to achieve a high level of operational safety and reliability,
• to maintain the cleanest possible combustion,
• to ensure safe and reliable operation and a long service life.
Maintenance work must only be carried out by approved contractors.
Use only original spare parts. The results of the inspection must be
recorded in the inspection and maintenance protocol.
Offer your customer an annual maintenance and inspection contract,
which is based on actual requirements. You can check in the inspection
and maintenance protocols which activities must be included in a
maintenance contract ( Chapter 17.7).
Refer to the spare parts catalogue when ordering spare parts.
We recommend the service set for the burner maintenance.
11.1

Preparing the floor standing boiler for inspection

DANGER
Danger to life from electric current!
▶ Before opening the boiler, isolate all phases of the mains voltage and
secure against unintentional reconnection.
▶ After isolating, wait 5 minutes to allow the capacitors to discharge
before touching live parts.
CAUTION
Risk of injury from protruding components!
After disassembly of the casing, components of the boiler may protrude.
▶ When working on the boiler, take care of danger sources, in particular
in the area of your head.
▶ If necessary, cover the respective components.
Remove front panels
▶ Shut down the heating system.
▶ Remove the fixing screws on the top of the floor standing boiler and
remove the upper boiler front panel.
▶ To do this, slightly raise the lower boiler front panel and remove it
towards the front.
34
Removing the side panels
▶ Slightly raise the front side panel, then tilt outwards and lift off.
▶ Remove the two fixing screws at the rear that secure each of the rear
side panels.
▶ Slightly raise the rear side panel, then tilt outwards and lift off.
3
2
1
Fig. 40 Remove front panels
[1]
Front panel at bottom
[2]
Front panel at top
[3]
Fixing screws
Condens 7000 FP – 6721846699 (2022/12)
0010037109-001

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gc7000fp 350Gc7000fp 400Gc7000fp 500

Table of Contents