2023/11/28 06:40:03 (GMT+09:00)
SECTION 2: XR-65A80* / XR-65A75L
INFORMATION
Caution:
1.
Operator need to fix Smart Core on FLAT surface before FFC insertion to ensure FFC STRAIGHT insertion.
2.
FFC side with blue supporting tape, must face CONNECTOR WITH LOCKING during FFC insertion.
After assemble Receiver board to Smart Core, operator need to insert Receiver board FFC in straight condition.
Smart Core is placed on FLAT surface during FFC insertion.
WIRE DRESSING
TOOLS & EQUIPMENTS FFC PRECAUTIONS
FFC side with blue supporting tape face connector
with locking during insertion.
S E C T I O N 1
S E C T I O N 2
S E C T I O N 3
S E C T I O N 4
2-3. WIRE DRESSING
37
37
S M AR T C O R E
AP P E N D I X
SYS SET