Download Print this page

Advertisement

Quick Links

PERTRONIC F220 IN-PANEL
with Enhanced Information (In-Built SPIB)
1. Installation
a. Install CTU on to Pertronic F220 Fire Alarm Panel Masterboard using supplied
stand-offs
2. Data Interface Connections (Loom / RS-485)
a. Connect 5 wire loom (SGD Ribbon) on CTU board C2 connector (cable to the right)
b. Connect to F220 Masterboard 5 wire loom connector (cable to the bottom)
c. Connect 3 wire cable to CTU SGD Port 1 (A,B,Neg)
d. Plug the 3 wire/4 pin connector to the F220 Masterboard "Internal RS-485" pins
3. Mains Power Supply (24v DC)
a. Connect one end of supplied 2 wire cable in to DC input on CTU
b. Connect to the 24v DC output on the F220 24v Output
4. Backup CTU Battery (2x 6v 1.3ah)
a. Connect battery leads in to BATT input on CTU
b. Attach to batteries placed behind F220 Masterboard batteries, connect batteries
with supplied link
c. Note light will momentarily illuminate red when charging or running on batteries
5. CTU Aerials
a. Dual aerials required. Connect aerial flyleads/cables to both the Main and
Diversity connectors on the CTU
i. Dome Antenna – Install aerial in to knockout hole. Feed leads through
ii. Patch Antenna - Run cabling through top of F220 panel and mount
6. Commissioning Tests
a. Comms light illuminates solid green to show CTU is connected to the cellular
network
b. Contact office on 03 341 0464 to test and commission the CTU and complete the
connection to Fire & Emergency NZ.
M:\General\Technical Info\Pertronic\Pertronic F220 In Panel Instructions\Pertronic F220 In Panel CTU Installation v0.1
(WITH Enhanced Information).docx
CTU INSTALLATION
panel, then washer and nut. Connect cabling to CTU. Screw washer and nut
tight.
following '4G LTE Aerial Installation' recommendations (approx. 150-
200mm apart). Temporarily fix aerials to window ready for commission
testing.
8/07/2022

Advertisement

loading

Summary of Contents for Pertronic F220

  • Page 1 Connect to F220 Masterboard 5 wire loom connector (cable to the bottom) c. Connect 3 wire cable to CTU SGD Port 1 (A,B,Neg) d. Plug the 3 wire/4 pin connector to the F220 Masterboard “Internal RS-485” pins 3. Mains Power Supply (24v DC) a.
  • Page 2 CTU Connection RS-485 Port CTU Dual Sim Cards DC 24v Wire DC to From Panel 24v Here Battery Input CTU 2x 6v 1.3ah Batteries M:\General\Technical Info\Pertronic\Pertronic F220 In Panel Instructions\Pertronic F220 In Panel CTU Installation v0.1 (WITH Enhanced Information).docx 8/07/2022...