Bastion WF5K User Manual ESWMF51H5110BCV01B Manual de utilizare 335.11.23.1 Before using this product, carefully read all product documentation and retain it for future reference.
Contents 1.Safety Information 1.1 General Safety 1.2 Personal Safety 1.3 Electrical Safety 1.4 Environment Safety 1.5 Transportation Safety 2.Product Information 2.1 Battery Overview 2.2 Appearance 2.3 Dimensions 2.4 Capacity Options 2.5 Display 2.6 Operation 2.7 Multiple Batteries Parallel Connection 3.Installation 3.1 Unpacking and Inspection 3.2 Tools and Materials 3.3 Installation...
Page 3
Please read through the manual carefully before installing and using the energy storage module, and keep the manual well for future reference. Application Model Bastion WF5K Applicable Personnel This user manual is intended for photovoltaic (PV) inverter operating personnel and qualified electrical technicians.
Safety Information 1.1 General Safety Please carefully read the manual safety precautions, and observe all the safety instructions on the equipment and in this document. The “DANGER”, “WARNING”, and “NOTICE” statements in this document do not cover all the safety instructions. They are only supplements to the safetyinstructions.
Personal Safety DANGER - Do not place battery at a children or pet touchable area. - Do not touch the energized battery, as the enclosure is hot. - Do not touch the energized battery terminals. - Do not stand on, lean on, or sit on the battery. 1.3 Electrical Safety Symbols on battery There are some electrical symbols on battery relate to electrical safety.
Page 6
product meets CE mark certification. Can’t leave battery as garbage WEEE tag disposal. Recycle Battery can be recycled DANGER - Before installation, ensure that the equipment is intact. Otherwise, electric shocks or fire may occur. - Do not connect or disconnect power cables when battery is poweron.
WARNING - Recharge battery every six months. - Recharge battery within 10 days after battery is fully discharged. - Please engage greater than or equal to two batteries when maximum charge current is more than 100A. - Make sure battery cable placement is installed correctly. - Use moto meter to make sure there is no voltage between positive and negative terminals after power-off...
Product Information 2.1 Battery Overview The Bastion WF5K battery is a wall mounted lithium battery pack which consists of long life-span LiFePO4 battery cells and functional BMS. It can store and release electric energy based on the requirements of the...
Features •LiFePO4 prismatic cell • 6000 cycles at 1°C condition • Maximum 1C charge and discharge capability • No dip switches, addressing automatic self-adaption • Scalable up to maximum 15 packs • Protective and active BMS allows greater reliability and control •...
2.4 Capacity Options The battery can be parallel connected for extending power(kW) and energy(kWh) WARNING - The maximum power(kW) is limited by main cables from master battery to inverter when all batteries are link connected - The maximum power(kW) can scalable when all batteries are parallel connected by current combine unit.
Page 12
Charging When battery is in charging, top green light is flashing, below green lights are solid on. RUN green light is solid on. Discharging When battery is in discharging, all green lights are solid on. RUN green light is flashing. Warning and Protect When warning happens, ALM red light is flashing.
2.6 Operation NOTE! ● Please remove the operation panel to see the hiding connections. ● Please operate by qualified engineers. Start Button -When battery is sleeping, push start button for 3~6 seconds to start battery, all lights are flashing in turn. Battery is waked up. -When battery is working, push start button for 3~6 seconds to sleep battery, all lights are flashing in turn.
Page 14
Main Switch (Breaker) Main switch is a DC breaker to physically to connect or cut off main circuit of battery. Communication Ports 1. CAN/RS485 port is for inverter BMS communication. 2. RS232 port is only for debugging through computer engineer software, all battery information can be read here.
NOTE! ● Please be aware the battery BMS protocol need to be compatible with inverter. ● CAN communication baud rate is 500K. ● RS232 communication baud rate is 9600bps. ● Please communicate with inverter or engineer software by correct RJ45 Pin addresses Power Connectors NOTE!
Power cable connection To inverter Installation 3.1 Unpacking and Inspection Please inspect all items when unpacking. Please ensure there is no any damage for all items. Description Item Battery Pack 5.12kWh battery pack 1Set Bracket Wall mounted bracket 1Set Anchor Bolt Wall mounted M8x60mm Bolt 6 PCS Cable Plug...
3.2 Tools and Materials Please prepare the below needed tools, materials and safety gear before installation. a) Tools RJ 45 crimper b) Materials ① Network cable ② 6AWG red positive power cable ③ 6AWG black negative power cable ④ Ground cable c) Safety Gear...
3.3 Installation The battery is wall mounted or ground stand directly. Please follow the below steps for install. A) Use the bracket as the template to mark the positions of 4 holes, then drill 12mm holes and make sure the depth of holes is deeper than 60mm. B) Please mount the bracket on the wall by anchor bolts tightly on the wall.
Page 19
D) Install the battery on the wall mounted bracket. Or battery can stand on the ground back to the wall directly. DANGER To prevent potential damages and injuries from heavy battery falling down, please carefully hang the battery on the bracket by two people.
F) Please remove operation area plate on the right side of battery pack. And please connect power cables, network cable and ground cable in the correct ports. For multiple batteries parallel connection, please see the content 2.7 in page 13th. NOTE! ●...
4.2 Battery Information Check NOTE! ● Please read battery parameters by engineer software. ● Please change language by right bottom flags when necessary. ● Please follow chapter 2.6 pin definition and USB kit to achieve RS232 port to computer. After click Open and the communication is successful, you will have a green rolling columnar and shows Normal.
Page 22
Disposal of Old Electrical & Electronic Equipment (Applicable in the European Union and other European countries with separate collection systems) This symbol on the product or on its packaging indicates that this product shall not be treated as household waste. Instead it shall be handed over to the applicable collection point for the recycling of electrical and electronic equipment.
Page 23
Cuprins 1.Informatii de siguranta 1.1 Informatii generale de siguranta 1.2 Siguranta personalului 1.3 Siguranta electrica 1.4 Cerinte cu privire la mediul de instalare 1.5 Siguranta la transport 2.Informatii produs 2.1 Privire de ansamblu baterie 2.2 Aspect 2.3 Dimensiune 2.4 Optiuni de putere 2.5 Ecran 2.6 Operarea 2.7 Conectare in paralel a multiple cabinete de baterii...
Page 24
Va rugam sa parcurgeti manualul inainte de a instala si opera cabinetul si pastrati-l pentru viitoare referinte. Model Bastion WF5K Pentru personal autorizat Acest manual de utilizare este dedicat personalului autorizat in instalari de invertoare on-grid si pentru electricieni calificati.
Informatii de siguranta 1.1 Informatii generale de siguranta Va rugam cititi cu atentie masurile de siguranta si precautie prezentate in acest document. Avertismentele notate cu PERICOL, AVERTISMENT, NOTIFICARE din acest document nu sunt extensive. Ele sunt doar completari la masurile de siguranta generale.
Siguranta personal PERCOL - Nu lasati bateriile la indemana copiilor sau a animalelor de companie - Nu atingeti bateriile in stare de functionare deoarece carcasa poate fi foarte fierbinte. - Nu atingeti terminalele bateriilor incarcate si functionale. - Nu va asezati, sprijiniti sau urca sub nicio forma pe baterii. 1.3 Siguranta electrica Simbolurile bateriei Exista cateva simboluri electrice plasate pe baterie care deservesc...
Page 27
Insemn CE Acest produs este certificat CE Nu se poate arunca bateria in Insemn WEEE gunoiul menajer Reciclati Bateria trebuie reciclata PERICOL - Inainte de instalare asigurati-va ca echipamentul este intact. In caz contrar, exista pericolul izbucnirii unui incendiu sau de socuri electrice.
AVERTISMENT - Reincarcati bateriile la fiecare 6 luni. - Reincarcati bateriile in maxim 10 zile de descarcarea lor completa. - Puneti in functiune mai mult sau cel putin doua baterii atunci cand curentul de incarcare este mai mare de 100A. - Asigurati-va ca este instalat corect cablul bateriilor.
Informatii produs 2.1 Privire de ansamblu baterie Bateria Bastion WF5K este un cabinet de baterii montabil pe perete cu baterii durabile de tip LiFePO4 si echipat cu BMS. Poate stoca si alimenta cu energie electrica in functie de setarile invertorului conectat. Este de...
Specificatii: • Celule prismatice de tip LiFePO4 • 6000 de cicluri de descarcare in conditii de 1°C • Maxim 1C capacitate incarcare-descarcare • Fara comutatoare DIP, se auto-adapteaza • Scalabil pana la 15 cabinete. • BMS-ul ofera protectie adecvata • Clasa IP54 •...
Din lateral cu panoul Din spate inlaturat ● Bracheti de montare ● Port de comunicare pe perete. ● Conectori de alimentare electrica ● Terminal de impamantare 2.3 Dimensiune 548mm 173mm 520mm 143mm...
2.4 Optiuni de putere Bateriile se pot monta in paralel pentru a le maximiza puterea (kW) si energia (kWh). AVERTISMENT - Puterea maxima (kW) este limitata de cablurile principale ale bateriei master conectata la invertor. - Puterea maxima (kW) este scalabila cand bateriile sunt conectate in paralel iar puterea lor este combinata.
Page 33
Incarcare Cand bateriile sunt in curs de incarcare, led-ul aferent nivelului de incarcare a bateriei lumineaza intermitent, iar celelalte led-uri verzi sunt Descarcare Cand bateriile se descarca, toate led-urile sunt apinse, cel de RUN lumineaza intermitent. Protectii si avertismente Cand este identificata o avertizare, led-ul ALM lumineaza rosu intermitent. Cand protectia la supraincarcare se activeaza, led-ul RUN este aprins verde, cel rosu ALM este oprit.
2.6 Operarea NOTIFICARE! ● Va rugam demontati panoul de operare pentru a avea acces la conexiunile ascunse ● Operarea va fi realizata doar de catre tehnicieni autorizati. Buton de pornire -Cand bateria este in modul Sleep, apasati butonul de start pentru 3-6 secunde pentru a porni, bateria iese din starea de veghe, iar led-urile vor lumina pe rand.
Page 35
Intrerupator principal Acesta este un intrerupator DC care conecteaza fizic sau intrerupe alimentarea circuitului principal al bateriei. Porturi de comunicare 1. CAN/RS485 portul este pentru comunicarea BMS cu invertorul 2. Portul RS232 este utilizat doar pentru depanarea eventualelor erori de pe un computer cu software-ul instalat, toate informatiile se vor regasi acolo.
NOTIFICARE! ● Asigurati-va ca protocolul utilizat de BMS-ul bateriei este compatibil cu invertorul. ● Rata de transfer a comunicarii CAN este de 500K. ● Rata de transfer a comunicarii RS232 este de 9600bps. ● Asigurati comunicare cu invertorul sau cu software-ul prin conectarea corecta a pinilor mufei RJ45 Conectori de putere Pozitivi...
Conectare cablu de putere To inverter La invertor Instalarea 3.1 Inspectie si desfacerea pachetului Faceti o inspectie vizuala a componentelor din pachet pentru a va asigura ca nu exista deteriorari. Obiect Descriere Cantitate Cabinet baterii 5.12kWh 1 set Brachet Pentru montarea 1 set pe perete Surub de...
3.2 Materiale si unelte Pregatiti urmatoarele instrumente, materiale si echipamente de protectie inainte de a efectua instalarea. a) Unelte Foarfece Marker Surubelnita Sertizor RJ45 Bormasina RJ 45 crimper de sarma Foarfece Cheie tubulara Ciocan Sertizor Tester de retea de sarma connector profesional b) Materiale...
3.3 Instalarea Cabinetul se va monta pe perete sau se va monta pe un suport direct pe pamant. Utilizati pasii de mai jos pentru instalare. A) Utilizati brachetul pentru a masura unde se vor face cele 4 gauri de 12mm in diametru si 60mm adancime. B) Montati bracketii pe perete cu suruburile de ancorare stranse fix.
Page 40
D) Instalati cabinetul pe bracketii deja montati. Sau direct pe pamant cu spatele sprijinit de perete. PERICOL Pentru a evita eventualele distrugeri sau raniri cauzate de greutatea cabinetului, la montare se vor prezenta 2 tehnicieni pentru a asigura ca operatiunea de montare decurge corect. E) Masurati corect lungimea necesara a cablul electric si de retea sa ajunga lejer de la terminalele bateriei la terminalele invertorului.
F) Indepartati capacul zonei de operare de pe partea dreapta a cabinetului de baterii. Conectati cablurile electrice, cel de retea si de impamantare in porturile corecte. Pentru conectarea în paralel a mai multor baterii, vă rugăm să consultați conținutul 2.7 de la pagina 34. La USB computer pentru depanare La portul BMS al invertorului La portul de legatura baterie de tip slave...
4.2 Verificare informatii baterie NOTIFICARE! ● Va rugam verificati parametrii bateriei prin intermediul software-ului. ● Schimbati limba utilizata prin intermediul steagurile din ecran, dreapta jos. ● Utilizati sectiunea 2.6 pentru a defini pini si kitul USB pentru a conecta portul RS232 la computer. Dupa deschiderea software-ului si stabilirea comuncatiei cu modulul de baterie, va aparea o coloana de rulare verde si va afisa mesajul Normal.
Page 43
Dezafectarea echipamentelor electrice si electronice vechi (Se aplica pentru ţarile membre ale Uniunii Europene si pentru alte tari europene cu sisteme de colectare separata) Acest simbol aplicat pe produs sau pe ambalajul acestuia indica faptul ca acest produs nu trebuie tratat ca pe un deseu menajer. El trebuie predat punctelor de reciclare a echipamentelor electrice si electronice.