Install 19-Pin Programmer Secondary Disconnect (Compartment)

Ensure only qualified personnel install, operate, service, and maintain all electrical equipment.
Installing the programmer disconnect should not be carried out when the compartment is live.
The compartment should be de-energized before the installing the programmer disconnect assembly.
NOTE: 12-Pin Programmer disconnect configuration is not provided with the AKD6 version of the Retrofills of the
EntelliGuard ACB.
To install the programmer disconnect in the AKD-6 switchgear, do the following:
1. Turn off power to the switchgear, if not done already.
2. Have these tools ready for doing the task: hand-drill, cleaning solution, antirust, and wrench for metric M6
bolt/nut.
3. Clean the base of the compartment of any dirt or foreign particles, if not done already.
4. Slide the inner frame assembly to its maximum inserted condition
5. This position corresponds to the frame position when the breaker would be in, fully connected.
6. Use the slot, inner semicircle as a datum reference and mark the mounting-hole locations using the template
shown in
(Figure
32). Dimensions shown are in inches.
7. Drill ¼-inch diameter holes at 4 locations as marked.
EntelliGuard R Circuit Breaker Retrofill AKD-6 Installation Manual
43
It must be ensured that the supply power to
the compartment is turned off/ compartment is
de-energized for all the incoming and outgoing
circuits of the LVS prior to any work being
conducted on it.
During the installation and related work on the
equipment, it must be ensured that the operator
is using the prescribed PPE for the specified tasks.
(Figure
32).