9
Assemble the panel on
CLM-F.
Tear down the two tape
behind the FFC and fix
the FFC of C/B to panel
Assemble the SPK to the
main-SHD, the correct
position reference on the
picture, then the lock 4
screws to fasten it. Stick a
acetic tapes to fix the line
of SPK
Assemble the LVDS to the
I/F, the correct position
reference on the picture
Assemble the PCBA to
Main-SHD
- 26 -
Go to with Left.
The FFC must be
affixed besides the
under edge of the
panel
Screw-driver
Without the gap within